An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Summary of Plant Operations TWG L. Waganer 12-13 December 2007 ARIES Project Meeting at GT Atlanta, GA

  2. Purpose, Scope and Membersof ARIES-TNS Operations TWG Review Purpose: Develop operational plans and recommended R&D to mitigate risk of plant operation Scope: - Develop operational requirements for Operations, RAMI, and test campaigns - Consider IHMS implications on operations - Identify R&D items that could reduce operational risk and enhance availability - Develop Operations R&D projects and plans - Consider both test operations as well as normal operations - Translate operational requirements into design requirements Tentative Members: Les Waganer, Boeing, Lead Chuck Kessel, PPPL, Physics Alan Turnbull, GA, Physics Lee Cadwallander, INL, Reliability Said Abdel-Khalik, GIT, Regulatory Issues Rich Peipert-Jr, Boeing, Maintenance Tom Weaver, Boeing, I&C

  3. Partial Draft of Plant Operations Completed Les Waganer developed and circulated a draft outline, suggested content, introduction (adapted from Mark Tillack’s Power Handling TWG draft report, and suggested goals and objectives. Lee Cadwallader contributed sections on (1) Plant Availability goal of 90%, (2) Safety and Environmental Standards, and (3) State of the Art Electrical Power Generating Plant Operations. Partially developed “Normal day-to-day control operations” Les provided some comments on staffing, degree of automation, and plant health monitoring and predictive capabilities. Lee added some discussion about man-machine interface and required operator actions on a typical plant operation. More work needed on “Normal Off-Line Operations (Distributed Control)” “Main Power Core Refurbishment” “Minor Scheduled Maintenance Operations (Power Core Non-Operational)“ “Unscheduled Major and Minor Maintenance Operations (Power Core Non-Operational Operations Draft Report

  4. Next Actions Encourage other authors to review and contribute to the Operations Report.Complete the remaining chapters and send out for reviewConcentrate on developing R&D Roadmap for Operations