16-2. Learning Objective 1. 16-3. benchmarks for measuring performance.. the expected level of performance.. used for planning laborand material requirements.. Standard costs are . . based on carefully predetermined amounts.. . . . . . Using Standard-Costing Systems for Control. 16-4. COST VARIANCE the differencebetween the actual cost andthe standard cost.
E N D
1. 16 Standard Costing,Variance Analysis and Kaizen Costing