420 likes | 571 Views
2. Fixed Overhead Variances. With Fixed Overheads we use BUDGETED fixed overheadsFixed Overheads are absorbed into units of outputTotal variance : Difference between actual fixed o'h and absorbed fixed o'h (ie under- or over- absorbed fixed o'h)Expenditure variance : difference between budgeted f
E N D