Status and Plans of the SPL study

Status and Plans of the SPL study. R. Garoby – 8/12/2011. First open collaboration meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) December 8-9/2011 CERN. OUTLINE Context and organization Recent progress Near future…. F. HP-SPL main characteristics.

blenda
Download Presentation

Status and Plans of the SPL study

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status and Plans of the SPL study R. Garoby – 8/12/2011 First open collaboration meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) December 8-9/2011 CERN

  2. OUTLINE • Context and organization • Recent progress • Near future… F

  3. HP-SPL main characteristics Beam characteristics of the main options 2 ´ beam current Þ 2 ´ nb. of klystrons etc . 3

  4. Resources • R & D for a High Power SPL formally supported at CERN in view of potential applications for n physics • ~1.7 MCHF and 6 FTEs / year • Collaboration with ESS • Fellows and procurement of klystron modulator for SM18 • French in-kind contribution • Tuners, Helium tanks, use of Saclay 704 MHz high power test place… • EC-supported programmes • EuCARD(WP10) • Development and test of beta=1 (CEA) and beta=0.65) 5 cells cavities • CRISP (WP4) • Joint work with ESS and DSY • EC-supported manpower for upgrading and exploiting the SM18 test place • LAGUNA-LBNO • EC-supported fellow for studying proton drivers at CERN using LP- or HP-SPL • DOE-supported programme • BNL • Development and test of a b=1 cavity 4

  5. Planning of SPL R § D Modulator from industry (ESS) To beupdatedat the beginning of 2012 5

  6. Planning overview • Until 2014 • Construction and test of a prototype cryomodule with 4 cavities • Construction and characterization of sc cavities • Upgrade of the SM18 infrastructure (clean room, 704 MHz RF, cryogenics) • Preparation for a full size cryomodule • Branching point for continuation • Recommendations of the European Strategy Group at end 2012/beginning 2013 • Updated Scientific Strategy of CERN by new DG: 2014? • Key ingredients for continuation: • Physics! Based on the results of LHC and of the on-going n experiments. • Strength / weaknesses of competing options (Linear collider …) • Strength / weaknesses of the SPL-related applications (Proton drivers for n facilities, Injectors for LHC-related future beyond HL-LHC, LHeC …) • CERN strategy for sc RF technology • Politics and collaborations… 6

  7. Related R & D Nb coating of Cu cavities, using the HIPIMS (High Power Impulse Magnetron Sputtering) technology • In collaboration with Sheffield Hallam University (UK). • Supported in the context of the construction of LHC spare cavities. • Potentially very attractive technology for the SPL (raw material cost, mechanical stiffness). • First results on low beta 704 MHz cavity: end 2012 7

  8. Present organization Study leader: R. Garoby Working Groups SPL Collaboration • SPL documentation in EDMS [ https://edms.cern.ch/nav/SLHC-000008 ] • SPL meetings in Indico [ http://indico.cern.ch/categoryDisplay.py?categId=1893 ] 8

  9. Principle of the future organization Motivation To better match the needs of the medium term goal of the HP-SPL R&D: Building and testing a prototype cryomodulewith 4 cavities Main principles • «Project-like» structure emphasizing relations between contributions (integrated planning) • Main objectives: • Design, construction and test of the prototype cryomodule • Components: Cryomodule, Cavities, RF items (Couplers, tuners, …), cryogenicsequipment… • Assembly (withadequatetools): cavities string in clean room, inclusion in cryomodule • Tests: cavities in vertical cryostat, assembledcryomodule in bunker. • Experience in SC RF cavitiestechnology • Fabrication and processing • Test, diagnostics and analysis • Upgrade of the SM18 infrastructure • Cryogenics for efficient operationat 2K • High power RF at 704 MHz (klystron, modulator, high power distribution) • LowLevel RF and controls 9

  10. OUTLINE • Context and organization • Recent progress • Near future… F

  11. Progress since July 2011 (1/2) More detailsduringthis meeting • Construction of 4 cavities in industry • Niobium (finally!) delivered • Fabrication contract signed • Decision to build one additional cavity at CERN in 2012 • Test of single cell sample cavity from CEA • In progress • Measurement and test with dumbbell copper cavity • In progress • Upgrade of cryogenics infrastructure in SM18 • Planned in 2012 • Order of 704 MHz klystron for SM18 • Order signed in September 2011 • Specification & order of klystron modulator from industry (ESS) • Specifications finalized • Supplier selected / order being signed ? • Preparation of 704 MHz RF components (Low Level and High Power) for SM18 • In progress More information on Friday 11

  12. Progress since July 2011 (2/2) • Review of Cryomodule Conceptual Design on November 4, 2011 • (Late but) done - https://indico.cern.ch/conferenceDisplay.py?confId=154284 • Construction & test of High power RF couplers + Review • Couplers and coupling boxes built, but problem with Cu-platting • High power RF tests started in Saclay • Review delayed to the first quarter of 2012 • Specification & construction of tuners and He tanks (CEA) • Delayed • LP-SPL CDR (jointly with PS2) • Delayed to 2012… • Organization of future meetings • Changed into “SLHiPP” open collaboration events • December 2011 meeting organized (CERN) / May 2012 meeting announced (Italy) More detailsduringthis meeting 12

  13. OUTLINE • Context and organization • Recent progress • Near future… F

  14. Next 12 months (1/2) … concerning the SPL itself (non-exhaustive list): • Update of the integrated planning taking into account the impact of the other CERN programmes • Follow-up of cavities construction (in industry and at CERN) and first tests… • Start of upgrade of cryogenics and overall infrastructure in SM18 • Tests of High power RF couplers + Review (Q1/2012) • Follow-up of klystron modulator construction in industry (ESS)… • Order of RF components for SM18 • Beginning of construction of prototype cryomodule (IN2P3) • Construction of He tanks (CEA) • LP-SPL CDR (jointly with PS2) • SLHiPP-2 meeting (3-4 May, 2012) 14

  15. Next 12 months (2/2) … concerning the applications of the SPL • Cost estimate of the high power SPL (in the context of EuRo-n / contribution to the IDS-NF) • Reactivation of studies for proton drivers in future neutrino facilities (in the context of LAGUNA-LBNO): • LP-SPL as injector of a 2 MW / 30-50 GeV synchrotron • HP-SPL with an accumulator as a 5 MW / 5 GeV proton source 15

  16. THANK YOU FOR YOUR ATTENTION!