480 likes | 589 Views
Work summary. Zhibin Sun Feb/12/2010. Outline. Part 1: MAB EOF for EL and (U,V) current in larger domain Part 2: GOM oscillator analysis. Part 1: MAB EOF. EL (U, V) current Period: 1993-1999. old. new. EL. (UV). Surface to 50m. 50m to 550m. Surface to 550m. Part 2.1: GOM.
E N D
Work summary Zhibin Sun Feb/12/2010
Outline • Part 1: MAB EOF for EL and (U,V) current in larger domain • Part 2: GOM oscillator analysis
Part 1: MAB EOF • EL • (U, V) current • Period: 1993-1999 old new
(UV) Surface to 50m 50m to 550m
Part 2.1: GOM • No wind • (gomn117_nodanown_47) • Composite for W(east) • 2000 to 2007
Movies (every 5 days) • 2000 • 2001 • 2002 • 2003 • 2004 • 2005 • 2006 • 2007
W(east)>=0 W(east)<0
Ww,WE Phase shift
EOF • volume transport • EL
U(au) U(al)
U(au) U(al)
U(au) U(al)
U(au) U(al)
EL Z(18C)
EL Z(18C)
EL Z(18C)
EL Z(18C)
U(au),U(al) U(au),U(al),Z(18C)
U(au),U(al) U(au),U(al),Z(18C)
U(au),U(al) U(au),U(al),Z(18C)
U(au),U(al) U(au),U(al),Z(18C)
Part 2.2: GOM • No wind • (gomn117_noassim_noptb_nown_41: 02 to 62) • Composite for eddy days • 1998/11 to 2003/11
Movies (every 5 days) • 1998 • 1999 • 2000 • 2001 • 2002 • 2003
With eddy No eddy
Ww,WE Phase shift
EOF • volume transport • EL
U(au) U(al)
U(au) U(al)
U(au) U(al)
U(au) U(al)
EL Z(18C)
EL Z(18C)
EL Z(18C)
EL Z(18C)
U(au),U(al) U(au),U(al),Z(18C)
U(au),U(al) U(au),U(al),Z(18C)
U(au),U(al) U(au),U(al),Z(18C)
U(au),U(al) U(au),U(al),Z(18C)