This summary outlines discussions on the pilot plant project for geothermal exploration. Topics include the concept, purpose, uncertainty of fluid characteristics, risk minimization, fluid sampling, and analysis. The stepwise development plan involves identifying the geothermal fluid, conducting tests and energy planning, and exploring potential energy and chemical processes. The pilot plant group, including experts in well simulation, electrical and chemical processes, and mechanical design, aims to ascertain the viability of the project and assess alternative systems. The current status involves early-phase progress and finalizing the completion strategy. 8 Relevant
E N D
Pilot PlantSummary of work Runólfur Maack VGK Engineering
Project meeting, June 24-27, 2001 • First discussions on pilot plant • Pilot plant concept and purpose • Conclusive on a simple pipe solution or concept • …… or the KISS principle
Argumentation • High level of uncertainty of fluid characteristics • To get the feeling for the fluid in as quick or cheap manner as possible • To minimize the risk for damaging the well • Fluid sampling and analysis • The development of the pilot plant will be stepwise
Phase 1 – Identification of the geothermal fluid Litterature study Theoretical analysis Sampling and analysis Recommendations for phase 2 Phase 2 – Utilization of the geothermal fluid Tests Energy process planning Chemical process planning Well completion Stepwise development
Purpose • Obtain first fluid samples • Indication of pressure, temperature, enthalpy • Propose how to deal with the fluid • Processes • Chemicals • Methodology to determine viability of IDDP • Side effects • Reinjection well • Deep well production zone
Processes • Potential energy processes • Thermal • Electrical • Potential chemical processes • Gas • Solids • Liquid
Pilot plant group • Albert Albertsson, HS, Deep Vision • Runólfur Maack, VGK, SAGA • Jón Örn Bjarnason, ROS, SAGA • Kristinn Ingason, VGK • Claus Ballzus, VGK • Teitur Gunnarsson, VGK
Well simulationJón Örn Bjarnason • Well simulation • Fluid flow analysis • Enthalpy, analysis • Temperature and pressure • .........
Electrical generationKristinn Ingason • Electrical processes • Direct • Indirect • Binary • The aim is to find out what additional pros and cons there are in the IDDP from conventional systems • ............
Chemical processesTeitur Gunnarsson • Chemical processes • Sulphur production? • CO2 production? • Methane gas • Hydrogen • Materials (gold?) • .............
Mechanical designClaus Ballzus • Pilot plant design • Conceptual design • Pipe diameter • Material selection • Pipe installation • ............... • Wellhead design
Present status • The progress so far according to plans • Still in the early phases • The present workshop is to finalize the strategy how to complete