190 likes | 203 Views
Explore the remote load control demo by Hafslund Nett for efficient power load management. Discover the ongoing activities, main objectives, and infrastructure details for controlling various power loads.
E N D
Demo of remote load control! Control of power loads by Hafslund Nett (former Viken Nett)! Composed by E-CO Tech (Håvard Nordvik) The Demo is made for the EFFLOCOM project (Energy EFFiciency and LOad curve impacts of COMmercial development in competitive markets)
Facts: Load control in the area of Hafslund Nett Ongoing activity • EFFLOCOM pilot: • identifying new controllable load groups • designing new tariffs • testing load control during limited time periods. • Implementation of hourly metering of 6200 customers. MAIN OBJECTIVES • Postphone distribution network reinforcements • Achieve network tariffs that gives the customer incentives for investment in load control. • Participate in the Regulating Capacity Option Market
CIS Front End MVS Executing remote load control 2. Data transmission level 3. Customer level 1. Central level Terminal Meter GSM (SMS) +Telephone Control unit Control unit (relay/switch ) High pressure pumps, electrical boiler, water heaters, motors, fans, air-conditioning, cooling compressors etc
Today, controllable loads mainly consists of electric boilers Today, About 20% of the peak load is controlled! Loads with limited flexibility represents a huge potential!!!
Description of the infrastructure of load control and hourly metering
CIS Front End MVS Central level • The Front End system is the interface between the system of direct communication and other software programs. One Front End is required for each system of communication (GSM, GPRS and PSTN) • All the software systems of the Network Company are gathered in the central level system. Customer Information System (CIS), Meter Value Server (MVS) etc.
GSM (SMS) +Telephone Transmission level • The system of direct communication of Hafslund Nett consists of GSM (Global System for Mobile communication) with SMS- and GPRS technology, as well as PSTN (Public Switched Telephone Network). • Hafslund Nett mainly uses communication directly from the Front-end system to the consumption point, without any communication concentrators.
Terminal Meter Control unit (relay/switch ) Customer level • Usually, the terminal is connected to the meter of the actual loads. In most cases electronic meters are used. • The terminal serves as a temporary storage of meter values before transmitting the metered data to the central collection system. • The terminal executes the load interruption or activates the load control by transmitting a signal to the load control unit. Load control can be interruption of loads or downward adjustment of loads.
Controllable loads Terminal CIS Terminal D100 Meter Front End MVS Infrastructure of load control 1. Central level 2. Data transmission level 3. Customer level GSM/radio/PSTN SCADA NIS Etc..
Network Company browser Internet: LeKey 132kV Customer browser Possible grid levels for metering and load control 72kV Wireless communication, GSM 22kV Controllable load Controllable load
Results from the pilot project Melting furnaces Cooling compressors Furniture dealer Pumping Plant 1,5MW 1,0MW 0,4MW 1,0MW 1,5MW • Interruptiononce a day all day • Interruption twice a day for two hours • Maximum 10 interruptions per year • 6 hours rest between each interruption • If a extraordinary situation occur, interruption is not possible!! Server
Example of extraordinary situations! • Inundation or conflagration watersupply of Oslo must have priority in such situations (Pumping plant) • If the request of remote load control occurs during starting-up a Copper-melting process, the melting furnaces will be full of copper and a the load control have to wait until the furnaces are empty (Small industry) • If any failuare occurs to the communication between the Network Company and the customer load, this could involve expensive and irreparable failure on the customer’s activity (All customers)
When convincing the customer to permit remote interuption/control of vulnerable loads, several barriers arise: • Duration of interruption/control • Time of rest between interruption/control • Number of interruption/control • Alert before interruption/control • Technical solution for interruption/control • Sufficient cost-benefit through the Network tariff • Consequense of a possible failure of interruption/control (reliability of direct communication) No influence ?
Hafslund Nett uses LeKey software to execute the remote load control (Demonstration)
Example – screen picture of Viken (1) Controllable loads Installed power load Reporting historical load curve for each load Reporting resulting load curve after interruption/control
Reporting results from remote load control Executing load control
Switching off the load at 12:00 Switching on the load at 13:00
CIS Front End MVS Executing remote load control 2. Data transmission level 3. Customer level 1. Central level Internet: LeKey Terminal Meter GSM (SMS) +Telephone Control unit Control unit (relay/switch ) • LeKey: • Web based • Communicates with different categories of terminals • Designed for operating in the RCOM market High pressure pumps, electrical boiler, water heaters, motors, fans, air-conditioning, cooling compressors etc The End