1 / 16

(e-vote 2011: April 3rd. 2009 08:00 UTC/GMT 10:00 Local time Oslo)

http://www.regjeringen.no/nb/dep/krd/lyd_bilde/nett-tv/nett-tvsending.html?id=548492. Qualification for tenderers. (e-vote 2011: April 3rd. 2009 08:00 UTC/GMT 10:00 Local time Oslo). Agenda. The qualification process and result

blithe
Download Presentation

(e-vote 2011: April 3rd. 2009 08:00 UTC/GMT 10:00 Local time Oslo)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. http://www.regjeringen.no/nb/dep/krd/lyd_bilde/nett-tv/nett-tvsending.html?id=548492http://www.regjeringen.no/nb/dep/krd/lyd_bilde/nett-tv/nett-tvsending.html?id=548492 Qualification for tenderers (e-vote 2011: April 3rd. 2009 08:00 UTC/GMT 10:00 Local time Oslo)

  2. Agenda • The qualification process and result • The tender process (Competitive Dialouge) until contract signing • Short presentation of next delivery • Useofsharepoint • Logon • Structureofsite • Update info/Picture • Doclib • Call in for teleconference • Questions

  3. Qualification • You can add new subcontractors

  4. Next delivery (2) 20.april based on: • All info from qualification • As-is process model-Aris-HTML-Word • Drafts to-be process model • Threat model

  5. Your delivery 20. april • Your proposed to-be (Based on as-is)-Aris-HTML-Word • Your preliminary proposed solution for Norway • Cost estimate- Not binding but be ”honest”- If you underestimate our budget will be to low • If you overestimate we will cut scope • Min-max-most likely estimate • We will provide excel template

  6. Excel template for cost estimate

  7. How to log on to SharePoint

  8. Upload a picture of yourself. Navigate to the following image library: https://evalg2011.no/Bilder/Forms/AllItems.aspx.

  9. Info received by e-mail

  10. How to join the teleconference:  1) Dial the following phone number: +47 21 56 96 35 (if outside of Norway please use  local number dial in number. See list below) 2) Enter the participant code: 316192# 3) You will be on hold with music until the moderator enters the call and start the meeting            To mute/unmute your line, press *6 on your phone keypad.

  11. How do we work now, what to expect? Process modelling AS IS

  12. Example AS-IS Phase 2 VotingElection Day

  13. Project status 3.April • Process modelling AS-IS ready • Started Process modelling TO-BE • Threat model • Project team site (Sharepoint2007)

  14. Our plans for the next 2 months April 3.: • Distribution of AS-IS processes and main ideas for TO-BE, to all qualified tenderers. May 4. • Publishing of TO-BE processes and more specific recuirements concerning functionality, usability and accessibility

More Related