1 / 3

Strip Module WG sessions at May AUW

Strip Module WG sessions at May AUW. Location, Times at AUW. We have 14 :00-18:00 on Monday, May 13 th for “ITK-SC Strip Modules (Barrel and Forward) ” in 30-7-018 Kjell Johnsen Auditorium So far I know of the following requests for talks: ABC130 submission (20’?) HCC status (20?)

blythe
Download Presentation

Strip Module WG sessions at May AUW

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Strip Module WG sessions at MayAUW

  2. Location, Times at AUW • We have 14:00-18:00 on Monday, May 13thfor “ITK-SC Strip Modules (Barrel and Forward)” in 30-7-018 KjellJohnsen Auditorium • So far I know of the following requests for talks: • ABC130 submission (20’?) • HCC status (20?) • Database for modules (15’?) • First look at production rates/QA (15’?) • Status of Petalet (30’) • Towards the ABC130 hybrid of the SuperModule (15’) • Electrical performance of the 8-module ABC250 SuperModule (15’) • So far roughly 80 minutes still available for talks/discussion

  3. Last time at CERN(3 ½ hours) • 30’Status of ABCn130 • 30’ Status of HCC • 30’ ASIC submission scenarios and timescale discussion • 30’ Break • 20’ 250 nm stave module status • 20’ 130 nm stave hybrid/module plans • 20’ Petal hybrids/module status • 20’ Status of supermodule, ABC130 hybrid, production in industry • 10’ G&A Engineering • 10’ Teledyne Microelectonics • 10’ Status of DB development • 10’ Lorentz angle measureents Could add 250 nm and 130 nm stave hybrid/module status (30’?) Is there anything else? Would people like a status report on plans to test/probe ABC130?

More Related