TEST MODULE WG Cradles for CLIC module supporting system

TEST MODULE WG Cradles for CLIC module supporting system. 04-07-11. SUMMARY Introduction : different types of cradles Requirements Boostec cradles Epucret cradles Conclusion: next steps concerning cradles. Introduction: girders and MB quad support.

silvio
Download Presentation

TEST MODULE WG Cradles for CLIC module supporting system

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TEST MODULE WGCradles for CLIC module supporting system H. MAINAUD DURAND, N. CHRITIN 04-07-11

  2. SUMMARY • Introduction: different types of cradles • Requirements • Boostec cradles • Epucret cradles • Conclusion: next steps concerning cradles

  3. Introduction: girders and MB quad support • Several components will be pre-aligned on supports: •  Along the MB:  Along the DB: • RF structures on girders  PETS + DB quad on girders • MB quad on interface plate DB and MB girders will be interlinked with their extremities, based on so-called cradle. This allows a movement in the transverse girder interlink plane within 3 degrees of freedom (“articulation point between girders”). (Longitudinal direction adjusted thanks to a mechanical guiding). MB quad is mounted on an interface plate, allowing an adjustment along 5 degrees of freedom (longitudinal position will be positioned manually).

  4. Introduction: test module and cradles M Epucret S M Boostec S M Boostec S M Epucret S M S/M ? M S M C M S M C M M Master side Installed Ordered S Slave side To be designed 4

  5. Introduction: terminology Girder Ves Targets for fiducialisation Cradle Linear actuators Sensors Longitudinal adjustment Mechanical pre-alignment 5

  6. Requirements : main data • Adjacent girders will be interlinked with their extremities (so called cradle), allowing a movement in the transverse girder interlink plane within 3 degrees of freedom (X, Y, roll) • Colinearity of mean axis of Ves on two adjacent girders: 5 um, along X and Y axes in the transverse girder interlink plane 6

  7. Requirements : main data • Longitudinal positioning of +/- 0.3 mm will have no impact on the articulation point • Each extremity of a girder equipped with a cradle • On each cradle: several interfaces, positioned within 0.1 mm, and measured within 5 μm w.r.t mean axis of Ves. • Once one girder is installed, the second shall be installed from the top, with no interferences with supports and stretched wires already in place • Area protected : stretched wires • Interchangeability between cradles. 7

  8. Requirements : interfaces With sensors: • Each cradle hosts the following sensors: • 1 cWPS, screwed on a 3 balls interface • 1 oWPS, screwed on a 3 balls interface • 1 inclinometer, screwed on a 3 balls interface • 1 temperature probe, inserted in a hole with a diameter of 4.1 mm • Cradles must be rigid and stable in time, with no difference in their shape when equipped or not with sensors (deformations < 2 μm) • Slave and Master cradles equipped for test module. Once everything is validated, only master cradles will be equipped. 8

  9. Requirements : interfaces With girders: Reference surfaces for Boostec: one side / one below Reference surfaces for Epucret: one above / one side Boostec Epucret 9

  10. Requirements : interfaces With actuators: Each cradle supported by 2 vertical linear actuators, already ordered, and on radial linear actuator. Range of each linear actuator: +/- 3 mm, resolution < 1 μm With mechanical pre-alignment: Manual adjustment in longitudinal: +/- 0.4 mm, resolution 10 μm With articulation point: • Constraints and external forces applied: • Vacuum • Waveguides 10

  11. Boostec cradles Design of the articulation point 11

  12. Boostec cradles Design of the Boostec cradle: 12

  13. Boostec / Epucretcradles 13

  14. Epucret cradles 14

  15. CONCLUSION • First cradles installed are being tested in 169. Results are promising. Tests under progress • Qualification of concept of articulation point (Micro-contrôle versus Boostec/CERN: • Metrological evaluation • Behavior of the articulation point w.r.t micrometric displacements, w.r.t larger displacements (+/- 1 mm) • Impact at beam level • Impact of displacements on adjacent articulation points • Validation of algorithm of repositioning • Implementation of active pre-alignment 15

  16. CONCLUSION • Rigidity and stressmeasurements on 3 pieces foreseen this summer, to validate the theoretical study • Epucret cradles received (under CMM measurements), other mechanical parts (mechanical pre-alignment, articulation points) ordered last week, to be delivered end of July 2011. • Technical note will be ready end of July. 16

  17. Spare slides

  18. For a force applied of 10 N (micrometric screw) at the level of the hole (blue area), we have a displacement of 7.5 mm. At the output, we have a displacement of 0.3 mm.

  19. Elongation of 0.053 mm under a load of 400 kg Constraints in “ailettes” under load, with a displacement of 2 mm

  20. Pivot under load and inclined (one vertical actuator at 3 mm, the other one at – 3 mm)