1 / 29

Welcome OARtech Participants

Welcome OARtech Participants . December 12, 2007. OARtech OSCnet Engineering Update. Paul Schopis OSC Networking December 12, 2007. Backbone Update . Closing of ring 4 AEP has to move POP in Huntington WVA, will move turnup out to March 08

boaz
Download Presentation

Welcome OARtech Participants

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Welcome OARtech Participants December 12, 2007

  2. OARtechOSCnet Engineering Update Paul Schopis OSC Networking December 12, 2007

  3. Backbone Update • Closing of ring 4 AEP has to move POP in Huntington WVA, will move turnup out to March 08 • Gigabit portals at POPs with State Columbus, Cleveland and Dayton Turned up • Baldwin Wallace, Clark State, Lake Erie UNO, Zane State (almost), Washington State are on service

  4. Backbone Update • Current Gateways are running at 61% Average; 80% median • Total utilization is peaking ~5 Gbps • Getting additional bandwidth from Level3 • Additional Bandwidth needed for full protection • Looking at re-aggregating as BGP management is becoming troublesome

  5. Backbone Update • Newnet peering connection spiked on Nov 29 @ 2.2 Gbps • Additional increases will require additional bandwidth

  6. Backbone Update • Upgrades to backbone are ongoing • Adding 10 Gbps on several links • Ring 1 will be fully 10 Gig • Ring 0 will be fully 10 Gig • Adding 2 new Juniper M120 routers • Both are now operational

  7. Partners • Leveraging portals with state • Current Phase 0 implementation has State connecting to OSCnet routers but at layer 2 only, VLAN and MPLS back haul; ongoing • Phase 1 operational plans are being worked on

  8. New Directions • Merit interconnect update - Fiber splice date allegedly today 12/12/07 • Will light with 10 GigE • Will share port with NewNet

  9. New Directions • Pittsburgh connection gear is here • Youngstown side done • Still waiting on power resolution on Pitt side • PSC is moving POP

  10. I2 and NLR update • Same old stuff

  11. New Management Tools • Looking at ADVA for etherjack product • Includes IEEE 802.3ah, 802.1 ag, and ITU Y.1731

  12. Link OAM Service/Connectivity OAM Network Interface Device (NID) Carrier visibility of carrier network Carrier visibility of customer network • NID or NTE required at customer handoff for OAM • Analogous to smartjack, CSU/DSU or NTE for frame relay • Link OAM (EFM - IEEE 802.3ah) is necessary but not sufficient • Performance monitoring and threshold crossing alarms • Remote failure indication - Dying gasp, link fault & critical event • Remote loopback (Port) • Services OAM (ITU Y.1731) /Connectivity OAM (CFM IEEE 802.1ag) • SLA Monitoring/Performance monitoring • Continuity verification • Service level loopback • AIS/RDI or fault propagation • Test head to generate test suites (RFC-2544) • Cable integrity test for customer premise Backbone Network 10/100BT NID/NTE EoX Cust. Eqpmnt. Customer Premise

  13. Network Description Language • XML/RDF based • Being developed in GLIF • Not complete but may act as a basis • Allows one to drill down in network

  14. <?xml version="1.0" encoding="UTF-8"?> <rdf:RDF xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:rdfs="http://www.w3.org/2000/01/rdf-schema#" xmlns:ndl="http://www.science.uva.nl/research/sne/ndl#" xmlns:geo="http://www.w3.org/2003/01/geo/wgs84_pos#"> <!-- Description of CLMBS--> <ndl:Location rdf:about="#CLMBS"> <rdfs:label>SOCC</rdfs:label> <geo:lat>40.0</geo:lat> <geo:long>85.3</geo:long> </ndl:Location>

  15. <!--CLMBS-R0--> <ndl:Device rdf:about="#CLMS-R0"> <rdfs:label>CLMS-R0</rdfs:label> <ndl:locatedAt rdf:resource="#CLMBS"/> <ndl:hasInterface rdf:resource="#CLMS-R0:Gig1/0/0"/> <ndl:hasInterface rdf:resource="#CLMS-R0:Gig1/0/1"/> </ndl:Device> <!--CLMBS-R0:Gig1/0/0--> <ndl:Interface rdf:about="#CLMS-R0:Gig1/0/0"> <rdf:type rdf:resource="http://www.science.uva.nl/research/sne/ndl/ethernet#EthernetInterface"/> <rdfs:label>CLMS-R0:Gig1/0/0</rdfs:label> <ndl:connectedTo rdf:resource="#CLMBN-R0:Gig1/0/0"/> <ndl:capacity>1000</ndl:capacity> </ndl:Interface>

  16. Questions?

  17. OARtech Update:Client Services

  18. Client Service Updates OARtech 12.12.07Last Mile Upgrades Completed • Clark State Community College OPTEMAN • Baldwin Wallace OPTEMAN • Marion Technical College Time Warner 10 megabit • John Carroll OPTEMAN • Washington State Community College DS-3 • Ohio Northern University – OC-3 • Lake Erie College – OPTEMAN • Ashland University - Second DS-3

  19. Last Mile Upgrades in Process • Walsh University-Regional Campus OPTEMAN • Jefferson Community College - OPTEMAN • Southern State Community College - OPTEMAN • Sinclair Community College - GIGAMAN • Urbana University -Time Warner Cable • Capital Law School - Time Warner Telecom • Zane State College - OPTEMAN • Wright State University-Regional Campuses OPTEMAN • The Ohio State University – 10GIG connection • Campus EAI – Fiber Connection

  20. Last Mile Upgrades under review! • Lorain County Community College • Notre Dame College • Kent State University Regional Campuses

  21. New Co-Location FacilityAcademic, Research and Academic Services • Twenty Cabinets • Eleven Cabinets still available • 100 megabits of Internet • $2,500 one time fee, $500 month • 7 Clients Currently • Ruckus, Battelle, Longsight, Ashland University, Northwest State Community College, Ohio University, Rio Grande U. • New clients in ’08 • Cedarville College and Denison University

  22. Emergency Splash Internet Site • Ordering Equipment • Compiling costs and Resources • Pilot Schools • University of Northwestern Ohio • Denison University • Keep you posted!

  23. IntraOhio Bandwidth for Research? • Partnering with OCLC • Contacting LexisNexis and Chemical Abstracts. • Research Projects • Video Streams???? • Other uses of network • Thoughts??????

  24. OARtech Update:State of Ohio Health Networking

  25. Information Sharing • Background • FCC Rural Healthcare Program • Pilot Program • Received 82 RFPs • Awarded 69 • State of Ohio 3 largest award

  26. Information Sharing Summary of FCC Healthcare Proposals • Holzer Consolidated Health Systems • Impact 2 Counties: Jackson, Gallia • Award $1.8M over 3 years • Northeast Ohio Regional Health Information Organization • Impact 23 Counties: Cuyahoga, Summit, Stark, Portage, Mahoning, Lorain, Huron, Erie, Sandusky, Seneca, Ashland, Wayne, Stark, Holmes, Tuscarawas, Coshocton, Ashtabula, Carrolton, Columbiana, Trumbull, Geauga, Lake and Medina. • Award $11.3 M over 3 years • Southern Ohio Healthcare Network • Impact 15 Counties: Adams, Athens, Fayette, Gallia, Highland, Hocking, Jackson, Meigs, Morgan, Perry, Pike, Ross, Scioto, Vinton, and Washington • Award $13.1M over 3 years • West Virginia Telehealth Alliance • Planning on Internet 2 connectivity from Ohio

  27. Information Sharing • Three levels of connectivity • Regional • State • National • Review of Broadband Ohio network • Exploring National Options: Internet 2/NLR

  28. Resource Sharing • Are the Grantees considering allowing other entities to share access to the broadband network? • i.e., cities, counties, schools and non-profits • Are the Grantees considering coherent investments with Broadband Ohio?

  29. Financial Considerations • Post-grant sustainability and continued growth • How will we fund these services post grant? • What are the plans for expansion beyond grant? • Are Grantees considering joint investments with Broadband Ohio?

More Related