An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NATIONAL RAILWAY • INFRASTRUCTURE COMPANY

  2. TEN-T Comprehensive Network • All main Bulgarian railway sections are included in the comprehensive network • Intermodal terminals – Sofia, Plovdiv, Varna, Burgas, Ruse, Vidin, Lom, Dragoman, Svilengrad andGorna Oryahovitsa

  3. Ongoing projects2007-2013 • Plovdiv-Svilengrad Railway Electriffication & Upgrading of Corridors IV and IX • Phase 1 – Kruomovo - Parvomai: Contractor Terna – Greece • Contract value: 99 792 441 € – financing under ISPA programme • Phase 2 – Parvomai – Dimitrovgrad: Contractor Astaldi – Italy • Contract value : 68 000 000 € – financing under ISPA programme • Phase Systems – Plovdiv-Svilengrad-turkish border: Contractor Thales-Alcatel-Lucent – Austria • Contract value : 35 557 047, 06 € – financing under ISPA programme • Phase 3 – Svilengrad – turkish border: Contractor OHL ŽS – Czech Republic • Contract value: 69 999 666 BGN without VAT – financing under Operational Programme on Transport • Phase 4 – Dimitrovgrad - Svilengrad: completed tender procedure, expected contract signing on 3 implementation positions.

  4. Ongoing projects2007-2013 • Rehabilitation of Railway Infrastructure along Sections of the Plovdiv-Burgas Railway Line • Total investment value: 316 968 850,42 BGN without VAT • Main contractor: G.S.F. S.p.A – SK 13 – Trace Railinfra • Modernization of the railway section Septemvri-Plovdiv • LOT 1 – Septemvri – Pazardzhik: Contractor Swietelsky – RVP Köhne • LOT 2 – Pazardzhik – Stamboliyski: Contractor IGA Rail Infra • LOT 3 – Stamboliyski – Plovdiv: Contractor PorrBau GmbH • Total contracts value: 157 860 835,75 BGN without VAT

  5. Ongoing projects2007-2013 • Construction of an Intermodal terminal in South-Central planning region of Bulgaria • Forthcomingactivities • Preparation of Detailed Structural Plan and Plot Plan for expropriation procedures • Technical design • Construction • Indicative budget: 16 166 249 BGN without VAT • Design and implementation of geographical information system (GIS) for the NRIC needs • Total investment value: 12 000 000 BGN • Main Contractor: Consortium „EuroGeoRail“ • Project completion date: April 2011

  6. 2014-2020 priority implementation projects The projects are grouped in to A, B and V direction for effective management and operability achievement

  7. National Railway Infrastructure Company Group A projects – To the direction Dragoman-Sofia-Plovdiv-Svilengradand Plovdiv-Burgas part of the transeuropean transport corridors IV, IIIV and X; 1. Modernization of Sofia – Dragoman Railway Line • Preparation of Environmental impact assessment (EIA) report and technical design:2007-2013 • Construction: 2014 – 2020 • Indicative budget: 132 260 000 € 2. Modernization of Sofia – Plovdiv Railway Line • Technical design for Sofia – Septemvri railway section : 2007-2013 • Preparation of Environmental impact assessment (EIA) report of Elin-Pelin – Septemvri railway section:2007-2013 • Construction of Sofia – Septemvri railway section : 2014 – 2020 • Indicative budget: 1 081 000 000 €

  8. National Railway Infrastructure Company Group A projects – To the direction Dragoman-Sofia-Plovdiv-Svilengradand Plovdiv-Burgas part of the transeuropean transport corridors IV, IIIV and X; 3. Projects of Plovdiv – Burgas section completion – Corridor VIII • Indicative budget: 82 700 000 € • Including projects: • Construction of optic cable along Plovdiv-Burgas railway line, indicative budget:15 512 000 €. Construction: 2014-2020; • Introduction of interlockings in Karnobat-Burgas section, indicative budget: 5 466 000 €. Construction: 2014-2020; • Development of Burgas Railway Junction, indicative budget: 20 000 000 €. Design and construction: 2014-2020; • Rehabilitation of Plovdiv-Orizovo railway section, indicative budget: 30 677 000 €. Construction: 2014-2020; • Modernization of sections along Plovdiv-Burgas railway line (Orizovo – Mihaylovo, Yambol – Zimnitsa, etc.), indicative budget: 10 000 000 €, Technical design: 2007-2013. Construction: 2014-2020;

  9. National Railway Infrastructure Company Group B projects – To the direction Vidin-Sofia-Radomir-Kulatapart of the transeuropean transport corridor IV; 1. Modernization of Vidin-Sofia Railway Line • Preparation of Environmental impact assessment (EIA) report and technical design: 2007-2013 • Construction of separate sections along the route will start in 2014-2020 programming period: • Modernization of Vidin – Medkovetsrailway section62,5 км; • Modernization of Medkovets – Ruska Byala/Mezdrarailway section 84,3 км; • Modernization of Ruska Byala/Mezdra – Stolnikrailway section 76,3 км; 2. Modernization of Sofia –Pernik – Radomir Railway Line • Technical design: 2007-2013 • Construction: 2014 – 2020 • Indicative budget: 359 576 884 €

  10. National Railway Infrastructure Company Group V projects – Passangers and freights intermodality projects 1. Development of Sofia Railway Junction • Technical design: 2007-2013 • Design and construction: 2014 – 2020 • Indicative budget: 309 847 000 € 2. Construction of an Intermodal terminal in Sofia • Indicative budget: 31 345 000 € • IProject preparation will be implemented in 2007-2013 3. Construction of an Intermodal terminal in Central-Nord planning region of Bulgaria-Ruse • Fisibility study and preliminary design: 2007-2013 • Design and construction: 2014 – 2020

  11. National Railway Infrastructure Company THANK YOU FOR YOUR ATTENTION