120 likes | 212 Views
The Epoch_By_Epoch solutions of Long Range: 1 v.s. 3 Reference Sites. Ref. 174 km. 129 km. 196 km. Rov. Ref : 1. Ref : 3. Ref : 1. Ref : 3. Ref : 1. Ref : 3. Ref : 1. Ref : 3. Ref : 1. Ref : 3. 01Hrs. 24Hrs. 01Hrs. 24Hrs. RTD - Geodetics. QIF – Bernese 4.2. 40 km. 160 km.
E N D
The Epoch_By_Epoch solutionsof Long Range:1 v.s. 3 Reference Sites
Ref 174 km 129 km 196 km Rov
Ref : 1 Ref : 3
Ref : 1 Ref : 3
Ref : 1 Ref : 3
Ref : 1 Ref : 3
Ref : 1 Ref : 3
01Hrs 24Hrs
01Hrs 24Hrs
RTD - Geodetics QIF – Bernese 4.2 40 km 160 km rms = 5.8 mm 15 km rms = 4.9 mm
Conclusive Remarks • Correct Parameters: Correct coordinates Ambiguities Troposperic corrections • Session Independent, IF Correct Parameters
Long Range Epoch solution is possible • GPS linked Acoustic Seafloor Geodesy for monitoring Oceanic deformation