This documentation and training is provided to you by beas group AG. The documents are neither approved nor in any way acknowledged or endorsed by SAP. For SAP Business One, only the documentation and training officially released by SAP shall be binding upon SAP. SAP shall not be responsible for any content of this documentation and training and this documentation and training shall not be binding upon SAP in any way. The official current SAP Business One documentation and training for SAP Business One is available at http://service.sap.com/sbocustomer/documentation and http://service.sap.com/sbocustomer/training.
Requirements for this Tutorial What you should successfully master • Good knowledge of be.as • Good knowledge of general manufacturing processes and capacity scheduling • Training unit resource groups • Training unit parallel resources
Learning Targets After working through the lesson, you will be able to: • Work with the opimization tools which are available in be.as
Agenda Resource Optimization 1: General 2: Optimization of a resource group: preparation 2.1: Optimization of a resource group: execution 3: Optimization of parallel resources: preparation 3.1: Optimization of parallel resources: execution 4: General remarks
Resource optimizationGeneral Whatcan be optimized? • Utilizationofthe optimal resource in a resourcegroup • Utilizationofthe optimal parallel alternative resource in an operation
Resource optimizationHow does the optimization work in a resource group If in an operation optimization is active, for each resource in the resource group a lead-time scheduling is carried out, taking into account the reserved times for the appropriate resource. At forward scheduling it is checked, which resource should be used in regard to the earliest end date (shortest lead time). This resource will be used for scheduling and inserted into the operation.
Resource optimizationresource group Create a resource group with single resources and a plan resource. Set the resource group to directly schedulable, enable automatic optimization.
Resource optimizationresource group Enable resource optimization for the appropriate operations in routing and in the operation catalogue. (switch in extended tab)Use this switch also for blocking optimization if desired. This switch is also available in the work order, planning tab.
Resource optimizationresource group Select which resources of the group are included in the optimization. With drag&drop you can define the sequence of consideration.
Resource optimizationresource group Activate „automatic optimization“ in the resource. This must be done for the plan resource also.
Agenda Resource Optimization 1: General 2: Optimization of a resource group: preparation 2.1: Optimization of a resource group: execution 3: Optimization of parallel resources: preparation 3.1: Optimization of parallel resources: execution 4: General remarks
Resource optimization resource group: optimization disabled Example: In the operation a planning resource which represents the group, is deposited. Optimization is disabled in the operation. The planning resource can now be replaced manually.
Resource optimization resource group: optimization disabled Example: resource 1201 (one of the group) is deposited, representig the group.Optimization is disabled. Result: operations are dispatched successively.
Resource optimization resource group: optimization enabled Now the same example with enabled optimization. Example: resource 1201 (one of the group) is deposited, representig the group. In the first work order No 5 the resource 1201 and into the second work order No 6 resource 1202 is inserted.
Resource optimization resource group: change sequence If you change the sequence of optimization: Resource 1202 is considered first, only then 1201
Resource optimization resource group: optimization enabled Now resource 1202 is inserted in the first work order No. 5 and resource 1201 into the second work order No. 6.
Agenda Resource Optimization 1: General 2: Optimization of a resource group: preparation 2.1: Optimization of a resource group: execution 3: Optimization of parallel resources: preparation 3.1: Optimization of parallel resources: execution 4: General remarks
Resource OptimizationParallel resources Howdoestheoptimizationof parallel resourceswork? 1. All possibleconstellationsarecomputed. a) resource 1 with parallel resource 1 b) resource 1 with parallel resource 2 c) resource 2 with parallel resource 1 d) etc. 2. All constellationsaresimulated. 3. Thosewiththeshortestleadtimeareinserted in thework order andusedforscheduling.
Resource OptimizationParallel resources Create 2 identical work orders with 2 parallel alternative resources. Optimization is enabled in work sequence. The optimization of the main resource is the basis for the optimization of the sub-resource. In both work sequences resource INJ_EXT is active. Both work sequences start at the same time.
Agenda Resource Optimization 1: General 2: Optimization of a resource group: preparation 2.1: Optimization of a resource group: execution 3: Optimization of parallel resources: preparation 3.1: Optimization of parallel resources: execution 4: General remarks
Resource OptimizationParallel resources After rescheduling both work orders in work order 5 the main resource 1202 and parallel resource INJ_EXT was inserted. In the work order 6 the main resource 1201 and the parallel resource INJ_INT was inserted. This is the configuration with the shortest lead time.
Resource OptimizationParallel resources The result of the optimization is apparent in the graphical view.
Agenda Resource Optimization 1: General 2: Optimization of a resource group: preparation 2.1: Optimization of a resource group: execution 3: Optimization of parallel resources: preparation 3.1: Optimization of parallel resources: execution 4: General remarks
Resource OptimizationGeneral remarks Further possibilities: • Next to parallel alternative resources other parallel resources can be included in the optimization • Tools can be taken into consideration • Parallel resources and alternativ parallel resources can be taken into consideration, even if they are not utilized at 100%. Thus rough and detailed scheduling can be mixed.
Resource OptimizationGeneral remarks • In the main operation a resource or a planning resource of a resource group with enabled optimization is required. Detailed scheduling must be possible, that means (no capacity overload, only one machine is operated per resource of the group, capacity limits are observed. ) • Full optimization is only possible in forward scheduling. • Optimization of machine groups (one resource with multiple machine work) is possible only with limitations. Only rough planning by daily capacities is performed. • The optimization is computationally intensive because all possibilities are simulated.
Summary You can now: • Work with the opimization tools which are available in be.as