1 / 6

Number Resource Optimization Working Group

Number Resource Optimization Working Group. Report to NANC October 17-18, 2000 Brian Baldwin, SBC Beth O’Donnell, Cox Communications Eleanor Willis-Camara, Winstar Communications Co-Chairs. NANP Exhaust Projections.

kwalker
Download Presentation

Number Resource Optimization Working Group

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Number Resource Optimization Working Group Report to NANCOctober 17-18, 2000Brian Baldwin, SBCBeth O’Donnell, Cox CommunicationsEleanor Willis-Camara, Winstar CommunicationsCo-Chairs

  2. NANP Exhaust Projections • Pursuant to recent instructions from NANC, the NRO-WG reviewed and discussed existing assumptions with NANPA. • No new assumptions were drafted, but will be continually revisited as new data is gathered. • Discussed sensitivity analysis of impact of wireless inclusion in pooling.

  3. Pooling • California and Illinois matrices will be updated in January. • Additional information will be reported as it becomes available.

  4. ITN Report • Reviewed and affirmed October 1998 report. • Prepared new report and recommendation based on review of earlier report and new information. • It is too soon to implement ITN. • RECOMMENDATION: Implementation of ITN should be delayed until results of thousands block pooling are more clear and other less disruptive number optimization methods are investigated. • Forwarded recommendation to NANC Chair. .

  5. COCUS (NRUF) Requirements Document • Status of Document: NRO-WG will present final Requirements document to NANC at the November meeting. • COCUS report goes to NANPA and PA in areas where SPs are participating in pooling. • NRO-WG assumed that numbering resources will be withheld from SPs that have not submitted COCUS report to NANPA and PA. • NRO-WG assumed that PA will perform reasonableness tests for pooled NPAs as described in the COCUS Requirements Document. • NRO-WG forwards to NOWG the obligation to draft performance survey on COCUS.

  6. NRO-WG 2000 MEETING SCHEDULE Conference call times are Eastern; face-to-face meetings are local time. Oct 26 Conference call 1pm-4pm 800-862-1270, PIN 60022352 Nov 9 Face-to-face meeting 8:30am-4pm Washington, DC (Breidenbaugh/ISTA host) Nov 16 Conference call 1pm-4pm O’Donnell/Cox (if needed Meeting dates are subject to change depending on any new work that may be assigned to NRO-WG by the NANC.

More Related