1 / 25

Container / Vase / Bottle / Urn or Jar

Container / Vase / Bottle / Urn or Jar. Container any construction. Slab Constructed. Minimum dimension 8” Maximum dimension 10” . Slab Constructed with wheel work. If you are good enough to throw, you may use wheel thrown attachments You may make entirely on the wheel.

boyce
Download Presentation

Container / Vase / Bottle / Urn or Jar

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Container / Vase / Bottle / Urnor Jar Container any construction

  2. Slab Constructed • Minimum dimension 8” • Maximum dimension 10”

  3. Slab Constructed with wheel work • If you are good enough to throw, you may use wheel thrown attachments • You may make entirely on the wheel

  4. Slab Container • You may use any technique that you have learned to construct, but you must use ONE of the following decoration techniques • Relief • Bas-relief • Sgraffito

  5. Slab Containers • Relief, bas-relief and Sgraffito • rhythm • repetition • organic or geometric • Figurative • abstract

  6. Slab Container • Choose 3 elements • APPLYING • Balance • Movement • Rhythm

  7. Utilitarian (functional) ordecorative and nonfunctional

  8. Slab Container • Depending on your idea, the 8-10 inch height requirement may be altered

  9. Grading Scale • 1.inadequate ...................zero • 2.low .................................60 • 3.below average...............70 • 4.average ..........................80 • 5.above average...............90 • 6.excels .............................100

  10. Evaluation • Following objectives • Independent Problem solving • Work ethic • Construction technique • Composition • Finished surface • Sgraffito, relief, or bas-relief • 700 points possible Bonus opportunity: Fitted lid and Handles

More Related