An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FAAAirport Technology Research & Development Program Air Transport Committee ASCE National Capitol Section March 22, 2005

  2. FAA Airport Technology Research & Development Airport Pavement Technology National Airport Pavement Test Facility Non-Destructive Testing New Pavement Materials Airport Wildlife Hazard Abatement Runway Surface Technology Airport Planning Technology Visual Guidance & Airport Markings Airport Rescue & Firefighting Technology

  3. Airport Wildlife Hazards Who is cleared for takeoff???

  4. “Departure” “Taxiing” “Takeoff”

  5. ? RadarCalibration ?

  6. WARNING!!! Duck Before Crossing Runway

  7. Runway Surface Technology

  8. Pilot – “When did they put a highway here?”

  9. Overrun at Burbank “Jet-A Please”

  10. Who Said Concrete Is Heavy?

  11. Overrun at JFK

  12. Visual Guidance & Paint Markings Eat More Chicken!!!

  13. New Technology Old Technology

  14. Do you know where you are?

  15. Oops!!!

  16. Airport Rescue & Firefighting Technology Tilt Table Testing

  17. The Shape Of Things To Come

  18. Max Slide Length – 55.45 ft

  19. Why We Need Stronger Pavement?

  20. Airport Pavement

  21. BWB Aircraft Can you count the wheels?

  22. Development of Advanced Airport Pavement Design Procedures ADVANCED DESIGN PROCEDURES 2006 PERFORMANCE/ FAILURE MODELS 2004 BETA Testing 2002 ADVANCED MATERIAL MODELS NEW STRUCTURAL MODELS 2000 1998 LEDFAA 1.2 (AC 150/5320-6) NATIONAL AIRPORT PAVEMENT TEST FACILITY Center of Excellence 1996

  23. Advanced Airport Pavement Design Project Benefits • Potential capital costs avoided. • Avoid restricting loads of air carriers. • Avoid unnecessary strengthening of existing pavements and structures. • Avoid cost of delays. • $1.7 billion of capital costs avoided over the next several years.

  24. National Airport Pavement Test Facility (NAPTF) Required For: • FAA design procedures for multiple-wheel landing gears, flexible and rigid • precipitated by B-777 6-wheel • NLA (A380, B-747 Stretches) • Aircraft design (number of wheels, number of gears, configuration - NLA and HSCT) • ICAO ACN-PCN

  25. Who • FAA / Boeing Cooperative R&D Agreement • Funding and Technical Specifications • Management Board • Advisory Working Group • Corps of Engineers, Philadelphia District • Design Build Contract Administration • DMJM/Cornell • Design Build Contractor

  26. Working Group Representation • FAA and Boeing • University of Illinois FAA Center of Excellence • US Army, Air Force, and Navy • ACPA, Asphalt Institute • Canadian, French, Australian Government • PANY&NJ, BAA, ADP, Narita • Visitors

  27. When January, 1992 October, 1992 July, 1993 October, 1993 May, 1995 June, 1996 April, 1999 October, 1999 • AAS requirements meeting • First AAR W.G. meeting • Brochure • Design and Cost Study • RFP • Contract awarded • Completed (handover) • Response tests completed

  28. How • Design / Build Contract • DMJM / Cornell Joint Venture • Weidlinger for foundations • CTL for pavement instrumentation • Cornell and Design Projects for test vehicle • ARA for pavement design (except thickness) • U.S. Army Corps of Engineers, Philadelphia District, for project management

  29. How Much • $21 million total contract • $14 million - FAA • $7 million - Boeing Commercial Airplane Co. • $1 to $3 million continuing annual costs (depending on pavement reconstruction) provided by FAA

  30. NAPTF

  31. Aerial View During Construction

  32. Trafficking Rigid Pavement

  33. Trafficking a Severely Rutted Flexible Pavement

  34. Fun For Some…..Data For Others

  35. Trench in CC3-LFC2 Upheaval