US Cost Updates June, 2012. US Cost Updates Agenda. Introductions and Intent -- Overview and Understanding US Cost Upgrades –Today – June “Rapid-Response” changes. US Cost Updates Introductions and Intent Overview and Understanding.
E N D
US Cost Updates June, 2012
US Cost UpdatesAgenda Introductions and Intent-- Overview and Understanding US Cost Upgrades –Today – June “Rapid-Response” changes.
US Cost UpdatesIntroductions and Intent Overview and Understanding Janet Yih– Project Manager for BMO & PMO and Leader for the US Cost Project Estimating Program. Leadership to Direct, Lead, and Communicate the Project. Richard Grogan – Sr. Project Manager for NFS-BIO, SCAL, Coastal US Cost Subject Matter Expert (SME) The Database Pilot for Data Entry… Current US Cost Effort: • Upgrade to current platform version 10.2 from existing 9.1. This is pending and forthcoming. • Update the Database from circa 2009 price, structure and POR to 2012. New data, new technology, new prices, new solutions. • Make the system Easier to Use!!! And More Accurate…
US Cost Updates Today – June “Rapid-Response” changes. Rapid-Response Strategy (1): What – • Update Internal Labor Rates: Update to 2012 Price Structures: • $86 National & IMG. $75 allocated for Regional, using regional modifiers. • PC Prices: PC Unit Prices, Monitor Unit Prices, Mice Unit, and Printer Prices updated. KP Lexmark ‘standard’ printer price updated. • Wireless Assembly: Added $2.52 per square foot assembly prices. • Way-Finding: Added directional way-finding assembly. • Cable Infrastructure: Added new Clinical Technology outlet type with 8% (0.08) allocation of base infrastructure allocation (not for space plan type estimates). • Escalation: Implemented escalation rule of 2% per year. See important slide follow-up. PMs: Major changes in escalation handling!
US Cost Updates ESCALATION – A NEW AND DIFFERENT PARADIGM Escalation: What - The use of escalation in the system must be changed. The US Cost system has NO CONCEPT of ‘NOW’ or project start dates. There are only item price dates and a project date (end date). Why - The US Cost system is an estimating system, not a capital planning system. It assumes prices and escalation are managed every year on an on-going basis. With 2009 prices only, all estimates were escalating from 2009 until the project date (2009, 2010, 2011). There was no escalation (rules) beyond 2011 in the system. Who –SME: will update the escalation rules. How -SME: will update all assemblies in the templates and libraries for the base year of the items and cost structure. Management will ‘see and approve’ escalation based on future years and an approved ‘rate’ per year. PMs: Manage year of each item and check your work. Use improvements put into templates. PMs: Understand and use the new structure of escalation.
US Cost Updates Screen Captures of Sample Case 1 -Labor Rates: 2012 Based Prices
US Cost Updates Screen Captures of Sample Case 2 - PC Unit Pricing: PCs, Monitors, and Mice
US Cost Updates Screen Captures of Sample Case 3 - Wireless 4.x: New Assembly, $/Sq.Ft. Based
US Cost Updates Screen Captures of Sample Case 4 - Way-Finding – Location Based Signs: New Assembly, $/Sq.Ft. Based
US Cost Updates Screen Captures of Sample Case 5 – Cable Infrastructure: Clinical Technology Allocation – 8% of Base Amount
US Cost Updates Screen Captures of Sample Case 6a - Escalation: New Paradigm at the Estimate Level, Life Beyond 2012
US Cost Updates Screen Captures of Sample Case 6b - Escalation: New Paradigm at the Rule Level, Life Beyond 2012
US Cost Updates Screen Captures of Sample Case 6c - Escalation: The Big Difference – The Project Date now works. Due to base year versus project year calculation, the total escalation will vary. This is not based on project year alone, but from device and labor year to project year.
US Cost Updates Screen Captures of Sample Case Sample Estimate: Summary Costs
US Cost Updates Screen Captures of Sample Case Sample Estimate: DetailedCosts(1)
US Cost Updates Screen Captures of Sample Case Sample Estimate: DetailedCosts(2)