WiFi Project Updates (P17870) WiFi Vendor Comparison and RFP
Program Agenda • (P17870) WiFi Vendor Comparison and RFP • Authentication re-design • Roll out plan – Complete • FY13 budget $1.7M • FY14 budget $3.5M • FY15 budget $2.6M
Milestones • Free AP deal – in work with legal now • Authentication pilot design documentation for STR and tech review - no • Authentication pilot in to STR - no • Authentication pilot in to Tech Review - no • Monitoring – in work 10% complete • Reporting - no, legacy reporting still in place • Core team training – complete and on going • Field team training – on going • User training - no • Controllers for other sites – no • ISE for auth pilot – yes • STR for new hardware - Done • Controller install for pilot sites – 90% complete • Access point install for pilot sites – in work 10% complete • AP deployment priority guide – complete • Access point install for other sites – on going • Authentication business case to Uwe and Steve D – complete • Authentication pilot documentation for CSARB - complete • Authentication pilot into CSARB – ready for review • Documentation for AP planning - complete • Documentation for AP install and testing - complete • Documentation for controller install – complete
Access Point, Pilot Sites, Other Sites • . New access point installation - 3602 • HQ region – 39 • AMER – 200 • EMEA – 19 • APAC – 8 Non-pilot sites complete • AMER – 2 • HQ - .5 • EMEA – 0 • APAC - 0 Pilot sites: • Reston – complete • Bozeman – no • NY16 – complete • 401ip2 – complete • SaoPaulo – complete • Cambridge - complete • Dubai – complete • TVP 2F - no • Tokyo Aoyama 0F - no • Taipei 33F - no • Singapore Suntec 4, 23F - no • Bangalore OTP - no • Hyderabad Campus – no
Project Notes • 19-DEC-2012 - https://stbeehive.oracle.com/content/dav/st/CISD%20Data%20Networks/Documents/Global%20Wireless%20Program%20Meeting%20Notes%20-%20APAC_19-Dec-12.pdf • 04-JAN-2013 • No update from last note due to holidays. • 10-JAN-2013 https://stbeehive.oracle.com/content/dav/st/CISD%20Data%20Networks/Documents/Global%20Wireless%20Program%20Meeting%20Notes%20-%20APAC_10-Jan-13.pdf
WiFi RFP Update - (P17870) WiFi Vendor Comparison and RFP • RFP complete as of 04-May-2012 • Rollout plan complete and communicated • Access point placement training complete • Hardware STR applied for – expected 11-OCT-2012 • Engineering Package for controllers – Complete and approved, additional engineering package for the actual installation needs to be completed • Controller purchase requisitions are placed – Installed and working HQ,ADC,RMDC,JAPAN, SG-almost complete. EMEA,AU,India may have to wait until after freeze. • Controller installation guide – completed (12-Oct-2012) • Complete pilot sites – in work • Change existing WiFi hardware standards for other locations – Complete • Work with authentication and management team on new design and start pilot – in work • Order other infrastructure components - this includes authentication and management system components • Authentication design package into CSARB and STR – in work • Authentication design package into technical review • Change WiFi design standard • Order authentication and management equipment • Install authentication and management equipment • Implement new authentication method into production