‘Toward TIARA’Final Plan for the collaborative R&D Program WP4 Presented by Paolo Pierini 26/11/2013
Deliverables One still to go TIARA-PP Final
Milestones One still to go TIARA-PP Final
Collaborative Programme • Task 4.3 will propose a coherent collaborative R&D programme to be carried on in the TIARA framework. • 4.3 DAP Definition of the coherent collaborative Accelerator R&D Program and identification of the necessary infrastructures. • This programme will identify the infrastructures needed to validate new technologies and to tests prototypes. The R&D Programme will also ensure appropriate coordination with non European accelerator R&D programs to be established. TIARA-PP Final
KARA/KTI • WP4 work started with the identification of the Key Accelerator Areas and Key Technical Items • Listed in D4.1, updated at MS17 • All KARA/KTI are part of the TIARA potential Workplan • The TIARA R&D Work Plan assembled by agreeing on a number of main R&D topics (“themes”) TIARA-PP Final
Groundwork for Work programme TIARA-PP Final
KARA/KTI & Projects Presented at Madrid mid-Term TIARA-PP Final
Towards TIARA Workplan • The TIARA R&D Work Plan assembled by agreeing within WP4 on a number of main R&D topics (“themes”) • Topics of sufficiently wide interest which aggregate several KARAs and KTIs • Emphasize that R&D items have potential impact on several applications • Address the needs of a broad set of communities • Not only HEP and Nuclear Physics, but also Light Sources, Medical, and Industrial applications • Identify Trends • Ongoing processes to develop EC stategies (ex. ESPP + others), no contrast with those • leads to need of periodic reassessment of workplan TIARA-PP Final
Shortlist/1 • High Energy Frontier • Including Circular Colliders, High energy Linear Colliders, Gamma Colliders, Muon Colliders and Plasma Acceleration Schemes • High Intensity/Luminosity Frontier • Including Spallation Sources, Radioactive Ion Beam Facilities, Higgs Factories, p-bar Factories, Neutrino Factories • Light Sources Development • Including the large variety of schemes under discussion, as Ultimate Rings, FEL-based facilities, 5th generation light sources, ERL-based light sources TIARA-PP Final
Shortlist/2 • Medical Applications • Environmental and Industrial Applications • Accelerator Cost Effectiveness, Energy efficiency & Reliability • Any R&D project enabling major improvements on these topics • Emerging Ideas & Technologies • This may be needed to cover KTIs which may not fall completely in the previous categories TIARA-PP Final
Draft deliverable available ~70% • For each theme we provide • A description of the scope • Class of facilities are encompassed in the topic • The context and the applications • Identify trends of the community interest, if any • A (non-comprehensive) list of projects which are currently ongoing or been planned in this topic on national, European, or international level • Try to highlight specific challenges in each • A list of KARA/KTI’s involved • A list of ARIinvolved • This is still pending, but ARIs will be retrieved from DB by their mapping to KTI TIARA-PP Final
High Energy Frontier • Based on ESPP • Projects mentioned • LHC • CLIC • Future Hadron Colliders • TLEP • LHeC • ILC • Muon • Plasma Colliders TIARA-PP Final
High Intensity • Either • Rare phenomena • High flux for applications • Projects mentioned • ESS • EURISOL • FAIR • IFMIF • Missing • Neutrino factories • ... TIARA-PP Final
Light Sources • Trends • Towards ultimate rings • Soft/Hard Xray FELs and high d.f. (cw) • ERLs • Projects mentioned • ESRF upgrade(s) • MAX IV • XFEL • SWISSFEL • LCLSII • ALICE • BERLINPRO • CORNELL ERL TIARA-PP Final
Medical Applications • Context • Therapy • Facilities • Gantries • Future developements • Radioisotope Production • Listing of existing facilities and proposals, mostly in Eu contexts TIARA-PP Final
Towards TIARA Workplan • What we do not/will not deliver • Priority ranking • Variety of institutions with different goals • Hard to build consensus in this preliminary phase • Discussed several times, but WP4 members feel analysis of priorities is not within our mandate • Costing estimates for KARA/KTI • Huge effort, require the technical expertise across many fields and manpower of several cost engineers to cover all the KTIs TIARA-PP Final
KARA & Workplan mapping DRAFT TIARA-PP Final
Status • Goal: Deliver D4.3 before end of TIARA-PP contract • Status: 70% of the work done (currently 26 pp) • 4 out of 7 «themes» drafted • Editing/Revision in progress • Raw contribution for the «Industrial Application» • Minute notes for drafting «Accelerator Cost Effectiveness, Energy efficiency & Reliability» • As soon a complete draft is assembled, it will be distributed to GC for comments • Approval at next GC during TIARA extension? TIARA-PP Final