1 / 16

1350 sq ft – 3BHK + 3 Toilets TYPE - T1

1350 sq ft – 3BHK + 3 Toilets TYPE - T1. 1350 sq ft -3 BHK + 3 Toilets TYPE - T2. 1450 sq ft – 3 BHK + 3 Toilets + Servant Room….. TYPE – T3. 1450 sq ft – 3 BHK + 3 Toilets + Servant Room….. TYPE – T3. Sizes & Prices.

brant
Download Presentation

1350 sq ft – 3BHK + 3 Toilets TYPE - T1

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 1350 sq ft – 3BHK + 3 Toilets TYPE - T1

  2. 1350 sq ft -3 BHK + 3 Toilets TYPE - T2

  3. 1450 sq ft – 3 BHK + 3 Toilets + Servant Room….. TYPE – T3

  4. 1450 sq ft – 3 BHK + 3 Toilets + Servant Room….. TYPE – T3

  5. Sizes & Prices • 1350 sq ft ( Three Bedroom + 3 Toilet ) – “ B ” Cluster. • 1450 sq ft ( Three Bedroom + 3 Toilet + Servant ) – “ A ” Cluster. • 1350 - B – Cluster = 300 Apartments. • 1450 – A – Cluster = 350 Apartments. • Total Number of Flats : 650 Nos. • Price : Rs.3250

  6. Room Size – Bifurcation • Total Number of Towers : 5 • Total Floors : Tower 1 & 2 = G + 24, Tower 3,4 & 5 = G + 28 • Room Size : 1350– A & B ( 300 Nos ) – Tower 1, 2 & 5 • Room Size : 1450 - A ( 350 Nos ) – Tower 1 & 2

  7. DOWN PAYMENT PLAN • At The Time of Booking : 10% • Within 30 Days of Booking : 85% + Car Parking + IDC/EDC + ESSC* - • Electric Sub Station Charges • On Offer of Possession : 5% + Club Membership + IFMS + Govt. Charges • ( Stamp Paper / Sales Tax etc ) • Upto 10% Discount in Down Payment Plan ____________________________________________________________________________ *(Electric Substation charges includes: Electricity Installation charges 2 KVA Mandatory/Power backup 1 KVA mandatory /Meter connection charges)

  8. CONSTRUCTION LINK PLAN • At The Time of Booking : 10% • Within 45 Days of Booking : 15% • On Start of foundation : 10% • On Casting of Basement Roof Slab : 8% + Car Parking • On Casting of 2nd Floor Roof Slab : 8% + IDC / EDC • On Casting of 5th Floor Roof Slab : 8% + PLC • On Casting of 9th Floor Roof Slab : 7% • On Casting of 12th Floor Roof : 7% • On Casting of 14th Floor Roof Slab : 7% + ESSC* • On Casting of 16th Floor Roof Slab : 5% • On casting of 18th Floor Roof : 5% • On Casting of 19th Floor Roof Slab : 5% • On Offer of Possession : 5% + Club Membership + IFMS + Govt. Charges (Stamp Paper / Sales Tax etc ) _________________________________________________________________________ *(Electric Substation charges includes: Electricity Installation charges 2 KVA Mandatory/Power backup 1 KVA mandatory /Meter connection charges)

  9. FLEXI PAYMENT PLAN • At The Time of Booking : 10% • Within 30 Days of Booking : 40% + Car Parking + IDC/EDC + ESSC* - Electric Sub Station Charges • On Casting of Basement Roof : 9% • On Casting of 2nd Floor Roof : 9% • On Casting of 6th Floor Roof : 9% • On Casting of 12th Floor Roof : 9% • On casting of 18th Floor Roof : 9% • On Offer of Possession : 5% + Club Membership + IFMS + Govt. Charges • (Stamp Paper / Sales Tax etc ) ________________________________________________________________________ *(Electric Substation charges includes: Electricity Installation charges 2 KVA Mandatory/Power backup 1 KVA mandatory /Meter connection charges)

  10. ADDITTIONAL CHARGES • Car Parking  : 2 ,00,000/- • Club Membership : 1,00,000/- • E.D.C /I.D.C : 125/- per sq ft • ESSC* (Electric Sub – station charges) : 40/- per sq ft • Lease Rent : 50/- per sq ft • I.F.M.S : 50/- per sq ft _________________________________________________________________ *(Electric Substation charges includes: Electricity Installation charges 2 KVA Mandatory/Power backup 1 KVA mandatory /Meter connection charges)

  11. Specification

  12. Specification

  13. REACH US: Head Office: Imperia Structures Ltd. A-25, Mohan Co-operative Industrial Estate, New Delhi 110044 www.imperiastructures.com Branch Offices: Lucknow | Patna | Allahabad | Ranchi | Jalandhar Disclaimer This Presentation is not a legal Document. It only describes the conceptual plan to convey the intent and purpose of the Developer. The details mention in this presentation are tentative and subject to change at the sole discretion of the Developer and / or competent authorities. A number of images in this presentation are artistic impression only.

More Related