An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MDOT University Region • 10 county region • 3 Transportation Service Centers (TSC) • Jackson TSC • Jackson County • Hillsdale County • Lenawee County

  2. I-94 Modernization Study • Began in December 2000 • Draft and Final Environmental Impact Statements (EIS) • 9-mile corridor from M-60 to Sargent Road • 8 Interchanges • 18 Bridges • EIS Purpose • Improve road and bridge condition • Improve travel efficiency • Improve safety • Two committees were established • Project Steering Committee • Technical Advisory Committee • Interchange and mainline alternatives were evaluated • 4 Public Information Meetings held at Baker College • Practical Alternatives presented at Public Hearing on April 17, 2002 • I-94 at the US-127 (West Avenue) interchange consensus building process • Record of Decision received from the Federal Highway Administration (FHWA) in 2007

  3. I-94 Recommended Alternative • 9-miles of mainline will be reconstructed • A third through lane will be constructed in each direction • A fourth merge-weave lane will be constructed in each direction between the US-127 west interchange and the US-127 east interchange • Shoulders and median will be brought up to current design standards • 7 interchanges will be reconstructed • Total estimated cost $409 million (in 2005 dollars)

  4. Phased Construction • Dettman Road and Hawkins Road Bridges over I-94 Reconstruction – 2009/2010 • Partial Sargent Road Interchange Reconstruction Including the Closure of the I-94 BL - 2011

  5. Phased Construction • US-127/M-50/West Avenue Interchange Reconstruction • Elm Road Interchange Reconstruction • Remainder of the Sargent Road Interchange Reconstruction • Lansing Road Bridge Reconstruction • I-94 over the Grand River Bridge Widening and Reconstruction

  6. Phased Construction • US-127 South Interchange Reconstruction • Cooper Street Interchange Reconstruction • I-94 Widening between the two legs of US-127

  7. Phasd Construction • Airport Road Interchange Reconstruction • I-94 Widening between US-127 South and Sargent Road • M-60 Interchange Reconstruction • I-94 Widening between US-127/M-50/West Avenue and M-60

  8. What has been done… • Hawkins Road (2009 - $4.4 million) and Dettman Road (2010 - $4.3 million) bridge reconstructions • Lengthened and raised to accommodate future widening of I-94 • I-94 at Sargent Road interchange reconstruction (2011-2012 - $19.6 million) and closure of the I-94BL interchange • Proximity of the interchanges • Condition level of I-94 BL bridge • $14.4 million in HPP funding secured by Congress from SafeTEA-LU plus $1 million from TEA-21 • Includes new carpool parking lot and new non-motorized path (in cooperation with Leoni Township)

  9. What’s next…? • I-94 at Cooper Street interchange reconstruction (2016 - $18 million) • I-94 over the Grand River and railroad (2017 - $22 million) • Road realignment project will address the approaches to the new bridge and the new interchange ($43 million)

  10. QUESTIONS?