An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PATH-Facility based Enabling DTHCs with Mobile Application for Supervision and Data collection. Gayo Mhila, D-Tree International, Tanzania

  2. Outline • Introduction- • Process of Developing FB tool • Documentation • Implementation • Prototypes • Work on progress and Challenges • Conclusion

  3. Process of Developing CommCare: Focus Group Observation Paper Protocols Build CommCare Test

  4. Work from a tireless group of RTHCs/DTHCs and DTLCs • The group of RTHCs/DTHCs and DTLCs spent two days in Kibaha reviewing the entire Checklist and Data collection paper tool • Field follow-up with DTHCs to observe the interaction and how data collection is done • The paper protocol was made based on the reviewed tool • The electronic prototype was designed based on the reviewed paper protocols • The same group of RTHCs/DTHCs and DTLCs got a 2 days training on the tool

  5. Implementation of PATH Comm • Conducted a two days focus group discussions • Three field visits -follow-up to observe the work flow and interaction between DTHCs and Health facility staff • Two days training of Supervision/Data collection tool • Four field support training after the FB training • Two different versions of FB is being deployed

  6. Supervision/Data collection

  7. Work on Progress • Continue to refine the tool to make it more user friendly • Research on the stable phones to handle the app. Nokia 5630c has been tested and proved to be able to run the app without problem • Specify alerts and reports needed from FB tool after phase 2 • Demo mode to be used to test the tool in order for users to test the tool with more submissions

  8. Challenges • Limitation of understand the existing system • The type of phone model capable to hand the FB app • Limitation of time to test the tool before the end of phase 2 (data collection done quarterly) • Airtime management, personal calls • Uptake and understanding technology-Ericson • Report specifications

  9. Review the indicators to determine success and failure of the project Thank you.