Storage Rings Group Meeting. 7 April 2010. Agenda. Admin. A-D Transfer Line (Jim) Injection/Extraction kicker (Dave) RF System Specification (Steve) Debuncher resonance stop band mapping study (Steve) Emasculated rings drawing (Brian) Next meeting April 21. Rings Group Web Page.
E N D
Storage Rings Group Meeting 7 April 2010
Agenda • Admin. • A-D Transfer Line (Jim) • Injection/Extraction kicker (Dave) • RF System Specification (Steve) • Debuncher resonance stop band mapping study (Steve) • Emasculated rings drawing (Brian) • Next meeting April 21
Rings Group Web Page Present location of our web page: http://www-bdnew.fnal.gov/pbar/organizationalchart/werkema/Mu2e.htm • Access to various Mu2e links. • Storage for meeting minutes and slides. • Place to put things of general interest to the group • New Rings Drawing FTL Budget code for AD Mu2e work: 475/1.02.01.01.02 (AD-Mu2e-Accelerator and Beamline-Conceptual Design)
Rings Group Organization 1.2.4 Storage Rings (Steve Werkema) 1.2.4.1 Storage Rings R&D (Werkema/Nagaslaev) 1.2.4.1.1 Momentum Stacking R&D (Peterson/Werkema) 1.2.4.1.2 Bunch formation R&D (Peterson/Werkema) 1.2.4.1.3 Injection / extraction kicker R&D (Dave VanderMeulen) 1.2.4.1.4 Space charge studies (Steve Werkema) 1.2.4.1.5 Coherent instabilities (Nagaslaev) 1.2.4.1.6 Lattice adjustments (Nagaslaev) 1.2.4.1.7 Accumulator / Recycler energy match (Top Men) 1.2.4.1.8 Beam studies (Everyone) 1.2.4.2 Beam lines (Jim Morgan) 1.2.4.3 RF Systems (Dave Peterson) 1.2.4.4 Instrumentation (Dave Peterson) 1.2.4.5 Cooling removal (Brian Drendel) 1.2.4.6 Beam Damper systems (Dave Peterson) 1.2.4.7 Beam abort system (Jim Morgan) 1.2.4.8 Infrastructure improvements (Brian Drendel)