An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Oberlin City School Facilities Major Facility Maintenance Projects

  2. Oberlin High School • Built in 1960 • Classroom addition in 1964 • Classroom and Auditorium addition in 1988 • 86,150 sq.ft.

  3. High School HVAC • Four gas fired hot water boilers, 1964, 1987 (2), 2005. • 1964 unit is out of service • Cost for replacement, $640,000. • Cost of entire heating system replacement: $2,030,800

  4. High School Systems • Roofs: All roofs are over 14 years old, except for choir room area. Expected replacement cost: $490,200 • Electrical: Transformer Replacement: $15,000 • Lighting: Upgrade classroom lighting, $338,480 • Masonry: $124,050

  5. High School Door/Windows • Replacement of all window units: $500,500 • Replacement of all exterior doors: $62,500

  6. High School Hazardous Material • Removal of all hazardous building materials: $281,600

  7. Oberlin High School • Boilers: $510,000 to $2,030,800 • Roofs: $490,200 • Electrical: $15,000 • Lighting: $338,480 • Windows and Doors: $563,000 • Hazardous material: $281,600 • Masonry: $124,050 • Total: $2,322,250 to $3,843,050

  8. Langston Middle School • Built in 1923 • Addition in 1945 • Renovation and addition in 1982 • 84,240 sq. ft.

  9. Langston HVAC • Two gas fired hot water boilers, 1958 • Cost of boiler replacement: $340,000 • Cost of entire heating system replacement: $2,021,760

  10. Langston Systems • Roof: Single ply roof system installed in 1996, out of warranty in 2011. Cost to replace: $254,700 • Electrical: transformer replacement: $15,000 • Lighting: $336,960 • Doors: $44,000

  11. Langston Foundation and Masonry • Foundation sealing: $10,000 + • Masonry repairs: $109,175

  12. Langston Hazardous Material • Removal of all hazardous building material: $130,672

  13. Langston Middle School • Boilers: $340,000 to $2,021,760 • Roofs: $254,700 • Electrical: $15,000 • Lighting: $336,960 • Doors: $44,000 • Masonry: $119,175 • Hazardous material: $130,672 • Total: $1,240,570 to $2,922,267

  14. Prospect Elementary School • Built in 1960 • Classroom addition in 1970 • Classroom addition in 1980 • 45,290 sq.ft.

  15. Prospect HVAC • Two gas fired steam boilers and three hot water boilers. • Cost of boiler replacement: $510,00 • Cost of heating system replacement: $1,086,960

  16. Prospect Systems • Roof: Many different roof surfaces, shingles and Garland section under warranty. Cost for replacement: $221,200 • Electrical: transformer replacement: $15,000 • Lighting: $181,160 • Doors/windows: $303,300

  17. Langston Foundation and Masonry • Foundation sealing: $10,000 + • Masonry repairs: $100,500

  18. Prospect Hazardous Material • Removal of all hazardous building material: $102,200

  19. Prospect School • Boilers: $510,000 to $1,086,960 • Roofs: $221,200 • Electrical: $15,000 • Lighting: $181,160 • Doors/windows: $303,300 • Masonry: $110,500 • Hazardous material: $102,200 • Total: $1,443,360 to $2,020,320

  20. Eastwood Elementary School • Built in 1955 • Addition in 1960 • Addition in 1960 • 38,660 sq.ft.

  21. Eastwood HVAC • Two gas fired hot water boilers, 1995 • Expected replacement in 2015: $340,000. • Total cost of heating system replacement: $927,840.

  22. Eastwood Systems • Roof: Built up roof system, much over 15 yrs. old. Preschool wing 2006. Total roof replacement: $198,425 • Electrical: transformer replacement: $15,000 • Doors/windows: $355,250 • Masonry repairs: $54,275

  23. Eastwood Hazardous Material • Removal of all hazardous building material: $113,700

  24. Eastwood Elementary School • Boilers: $340,000 to $927,840 • Roofs: $198,425 • Electrical: $15,000 • Doors/windows: $355,250 • Masonry: $54,275 • Hazardous material: $113,700 • Total: $1,076,650 to $1,723,915

  25. Oberlin City School District Totals • High School : $2,322,250 to $3,843,050 • Langston: $1,240,570 to $2,922,267 • Prospect: $1,443,360 to $2,020,320 • Eastwood: $1,076,650 to $1,723,915 • District: $6,082,830 to $10,509,552