An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Portal User Group Meeting December 3, 2009

  2. Agenda • Accessibility Committee Update • Visitor Statistics (Webtrends) • USA Search Status • Classic DSF - hold on new sites and training • DSF.Net Update • Status • Demo of product

  3. State of ConnecticutWeb Site Accessibility Committee Pam Casiano Chair pam.casiano@ct.gov http://www.access.state.ct.us/Default.htm

  4. Accessibility Committee • Listserv • Policy • Committee meeting (October) • Workshops • Basic Training • PDF Documents • Video Compliance

  5. Updates – Visitor Statistics • Due to budget cuts, we are unable to renew Webtrends • Interim solution is to use free Google Analytics • We would like to get all Portal sites on Google Analytics before January 1, 2010 • Historical WebTrends information will still be available • We expect to continue to analyze historic data through WebTrends

  6. Updates – Visitor Statistics • Google Analytics will only analyze forward (not historically) • Similar to SDC, the information will be more accurate, but potentially different than current WebTrends information • Report layout is different but intuitive • https://www.google.com/analytics/reporting/dashboard?id=23784154&pdr=20091101-20091201&cmp=average&trows=10#lts=1259761361449 • We may survey Agencies about whether they want separate reports for pre- and post-DSF.Net migration

  7. Updates – Visitor Statistics • What is involved in moving over to Google Analytics: • JavaScript code needs to be included on EVERY page to be tracked • Portal sites are easy: Code will be inserted into the template (the footer) • DOIT will work with Agencies not on the Portal • An account will be created in Google Analytics for each Agency • To track files (PDF, DOC, XLS, etc.), code must be added to the links to those files • DOIT will provide the code • Files will only be tracked from the links tagged (If the file is hit from another link, it will not be tracked)

  8. Updates – USA Search • Sites on USASearch – 97 • Global change was made on the standard templates • Outstanding sites - 2 portal and 5 non-portal sites

  9. Updates – Classic DSF • We have put a hold on all training and new site requests in Classic DSF • We have shifted all resources to DSF.Net • If you have a critical need for training or a new site, please include justification in Work Request Form

  10. DSF.Net – Project Update • Completed first round of testing in June 2009 • Cimbrian delivered code October 30, 2009 • Cimbrian informed us they significantly downsized their company due to financial difficulties • Impact to CT – they would be unable to do any further work on the system for an indeterminate amount of time

  11. DSF.Net – Project Update • We had identified the size of the company as a risk at the beginning of the project so we implemented the mitigation strategy which as CT Developers taking over the system • Joe Lapierre, Charlie Barnett, and Ken Mosher have been assigned to the system and have taken over the code • They will fix all bugs found in system and UAT testing and provide continuing support of the system

  12. DSF.Net – Project Schedule • October 30 – Cimbrian delivered build for system testing • Nov 5 – Nov 30 – PMG will be performing extensive system testing • Nov 5 – Dec 15 – CT Developers will fix issues found during system testing • Dec 21 – Jan 12 – PMG will perform 2nd round of system testing • Dec 21 – Jan 13 – CT Developers will fix issues found during system testing • Jan 19 - Jan 22 - User Acceptance Testing will be performed • February 3, 2010 – Start migrations to the new system

  13. DSF.Net – Upgrade Process • To get in the upgrade queue, agencies need to fill out the online form at http://www.ct.gov/cpi/cwp/view.asp?a=1766&q=439074 • We currently have 23 Sites in the queue • We will be migrating 4 pilot sites to the new system first. The sites are Department of information Technology (DOIT), Charter Oak Health Care (DSS), Teen Driving (DMV) and OPAPD • Once they are complete and we’ve streamlined the process, we will be begin with the sites in the queue

  14. DSF.Net – Upgrade Process cont. • Majority of process will be automated. • Areas that will require input from agencies include roles and permissions, eAlert topics, Workflow groups, and folder and subfolder permissions • We have decided not to move public users into the new system. We’ll have to send emails out to them that they need to re-register • Agency url will change to www.agency.ct.gov. Old url will redirect to the new site

  15. DSF.Net – Training Plan • We are working on two training options, Online Learning and Classroom Training with Adnet Technologies • Funds available in current budget but they may be cut

  16. DSF.Net Demo • Administration and Presentation sites • Create a new page • Add content • Add page to navigation • Put through workflow • Approve page • Review presentation site • Register a new user