22 Jan 2013, WLCG Management Board. Proposal for changes in the Availability Reports. David Collados . Introduction. SAM monitoring – Current S ituation ~36 distributed OPS t ests submission instances: 4 HEP tests submission instances at CERN. Introduction.
E N D
22 Jan 2013, WLCG Management Board Proposal for changes in the Availability Reports David Collados
Introduction SAM monitoring – Current Situation • ~36 distributed OPS tests submission instances: • 4 HEP tests submission instances at CERN
Introduction SAM monitoring - Current Situation • OPS: CEs (ARC, CREAM, OSG), SRMv2, Site-BDII • HEP VOs: CEs (ARC, CREAM, OSG), SRMv2 • ALICE: CREAM-CE • ATLAS: CREAM-CE, OSG-CE, OSG-SRMv2, SRMv2 • CMS: ARC-CE, CREAM-CE, OSG-CE, OSG-SRMv2, SRMv2 • LHCb: CE, CREAM-CE, SRMv2
Introduction • Generating 8 monthly availability/reliability reports • Tier0/1s History (last 6 months, OPS VO) • Tier0/1s VO OPS (last 6 months, OPS VO) • 4 Tier0/1s HEP VOs (last 6 months, HEP VOs) • Tier0/1s Summary (last month, OPS+HEP VOs) • Tier2s (last month, OPS VO) • Proposal to remove OPS tests from reports
Motivation • OPS infrastructure part of EGI-InSPIRE • Not sure how it will be after end of project • OPS tests do not reflect how sites are doing for experiments • Maintenance of OPS tests not clear after EMI • Reduce effort in availability re-computations • Homogenize and reduce number of monthly reports
Proposal • Remove OPS numbers from all reports • Replace existing reports with: • One summary report per VO including T0/T1s/T2s • One history report per VO including T0/T1s • Having similar content to existing ones
Impact • Funding agencies and RRB bodies will have more than one monthly number per Site • In case of test failure, site admins should be notified and be able to understand what the problem is based on the test output
Adoption Plan • Generate new reports for evaluation (March) • Review how T2s are evaluated compared to official OPS report (March/April) • Test may need changes (more verbose)? • Follow up on open issues • Present results and re-iterate process until confident with new reports (2/3 months) • Decide when to switch to new reports