1 / 37

FEMA

FEMA. Programa de Asistencia Pública Applicants’ Briefing FEMA-3326-EM-PR. 31 de agosto de 2011. Public Assistance Program.

Download Presentation

FEMA

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FEMA Programa de Asistencia Pública Applicants’ Briefing FEMA-3326-EM-PR 31 de agostode 2011

  2. Public Assistance Program • Autorizado por el StaffordAct, el Programa de Asistencia Publica ofrece asistencia a los estados, los gobiernos locales y algunas entidades sin fines de lucro para responder y recuperarse de los desastres.

  3. Governor’s Authorized Representative Para los desastres: FEMA-1247-DR-PR FEMA-1372-DR-PR FEMA-1396-DR-PR FEMA-1501-DR-PR FEMA-1552-DR-PR FEMA-1613-DR-PR FEMA-1798-DR-PR FEMA-3306-EM-PR FEMA-1919-DR-PR FEMA-1946-DR-PR FEMA-3326-EM-PR El GAR tiene la responsabilidad de administrar los fondos asignados por FEMA para los solicitantes y cumplir con el Acuerdo entre FEMA y el Estado según el FEMA-StateAgreement.

  4. 1. 2. 3. Desastre PDA & INF Declaración 6. 5. 4. Req. FEMA Kickoff Meeting Llena la Solicitud RPA Applicants’ Briefing 8a. Se preparan los proyectos 7. 10. 9. 8b. Se revisan los proyectos PO, Solicitante y el estado formulan los proyectos. Cierre de proyectos Proyectos se pagan

  5. Criterios Básicos de Elegibilidad • La reclamación es el resultado directo del evento declarado • Localizado en la zona designada • Debe ser la responsabilidad legal del un solicitante elegible.

  6. Incident PeriodPeríododurante el cual el eventocausadaños. Desde el 20 de agosto de 2011 y continua Para ser elegible, los dañostienenqueocurrir o ser el resultado de el eventoqueocurrióduranteesteperíodo.

  7. Cuatro Componentes Básicos de Elegibilidad Costo Trabajo Facilidad Solicitante

  8. Solicitantes Públicos • Estado Libre Asociado de PR y sus agencias. • Gobierno local, municipios. • Algunas organizaciones sin fines de lucro.

  9. Organizaciones Sin Fines De LucroPrivate Non-ProfitOrganizations (PNP) • Educativas (SBA) • Médicas • Servicios de Emergencia • Utilidades • Cuido institucional (SBA) • Otros servicios gubernamentales esenciales (SBA) SBA = Small Business Administration

  10. Organizaciones Sin Fines De LucroPrivate Non-ProfitOrganizations (PNP) Algunas Organizaciones sin Fines de Lucro deben ser evaluados por SBA, de no ser elegibles para un préstamo, podrían ser elegibles para el programa de PA. SBA = Small Business Administration

  11. CostosElegibles • Personal por Administración • Uso de Equipo Propio • Renta de Equipo • Materiales • Contratos • Acuerdos de Ayuda Mutua

  12. Costos No Elegibles • Daños causados por negligencia • Mantenimiento • Daños pre-desastres • Incremento en costos operacionales • Proyectos con costo menor a $1,000

  13. CostosRazonables • Costos pasados se usan como documentación “histórica” • Costos promedio por trabajo similar en el área • Costos publicados por el “National CostEstimatingDatabase” • FEMA costcodes • Subastas competitivas

  14. CostosDirectos Personal Equipo Materiales Contratos

  15. Personal • Solamente salario extra y beneficios marginales para empleados regulares. • Tiempo regular y extra para empleados temporeros. Trabajos de Emergencia

  16. Equipo • Precio se calcula utilizando: • FEMA Schedule of Equipment Rates • Precios aprobados por el Estado • Precios establecidos por el municipio • ¡Se reembolsa el costo más bajo de estos!

  17. Equipo FEMA Schedule of Equipment Rates • El uso de equipo del solicitante se paga por hora. • El precio de FEMA por hora incluye: • Costo de operación • Seguro y depreciación • Mantenimiento • Este precio no incluye al operador del equipo

  18. Excavator, Hydraulic Bucket Capacity 1.0 cy to 90 hour $39.00 Excavator, Hydraulic Bucket Capacity 1.5 cy to 160 hour $65.00 Excavator, Hydraulic Bucket Capacity 2.5 cy to 265 hour $120.00 Excavator, Hydraulic Bucket Capacity 4.5 cy to 420 hour $200.00 Excavator, Hydraulic Bucket Capacity 7.5 cy to 650 hour $240.00

  19. Materiales • Tienen que ser usados para trabajos elegible. • El reembolso es basado en: • Precio pagado • Materiales provenientes del almacén del solicitante • Materiales Donados • No son elegibles

  20. Contratos Son elegiblessi: • Son razonablespara el trabajocompletado. • Se subastanapropiadamente • No son contigentes a reembolsopor FEMA.

  21. Trabajos De Emergencia • Categoría B • Medidas de Emergencia y Protección

  22. Categoría B Medidas de Emergencia y Protección • Necesarias para: • Eliminar o reducir una amenaza inmediata a la vida, proteger la salud pública y/o la seguridad pública • Prevenir daños a la propiedad pública mejorada y privada • Son todas aquellas actividades necesarias que se llevan a cabo antes, después y durante un desastre por las siguientes razones:

  23. Categoría B Trabajo Elegible: • Aviso de que existen riesgos y peligros • Búsqueda y Rescate (Incluye transportación de victimas a causa del desastre) • Facilidades Médicas (Incluye facilidades temporeras y equipo requerido para tratar a las victimas tales como vacunas, labor, personal medico, ext.)

  24. Categoría B • Desalojo de facilidades médicas y facilidades de cuidado custodiada (Trabajo NO elegible incluye costos de labor de médicos, empleados y materiales necesarios para el desalojo.) • Los costos operaciones de facilidades de cuido en masivo en refugios proporcionadas por agencias voluntarios y las ofrecidas por las agencias de gobierno. • Seguridad en el área del desastre • Distribución de agua, hielo y otros artículos de primera necesidades en puntos de distribución.

  25. Categoría B • Generadores temporeros utilizados para proveer y/o mantener medidas de seguridad y salud • Rescate, cuidado y albergue de animales domésticos cuando es reclamado por el estado o gobierno local. • Facilidades temporeras, como escuelas temporeras (Publico y PNP) • Activación de centro de operaciones de emergencia para coordinar y dirigir la respuesta.

  26. Categoría B • Demolición y remoción de edificiosafectados (públicas o privadas) quepresentanunaamenazainmediata a la seguridadpública • Remoción de amenazas a seguridad y saludpública. Tales actividadespuedenincluirlassiguientes: -disposición de animalesmuertos -bombeo de aguacontaminada • Transportaciónpúblicaporemergencia

  27. Categoría B • Policía, Bomberos y Rescate. • Acceso de Emergencia • Comunicaciones de emergencia • Diques Temporeros y Bombeo de Agua • Medidas de Seguridad y Salud • Reparaciones Temporeras y de Emergencia

  28. Time limits 6 meses después de declaración

  29. Solicitud de Asistencia Pública o Request for Public Assistance

  30. Solicitud de Asistencia Pública • La forma utilizada para documentar una solicitud de un aplicante consiste de una página. Se llama “RequestforPublicAssistance” o (RPA) por sus siglas en ingles. • La información se utiliza para establecer el expediente del solicitante.

  31. Fecha Limite para Someter Forma de RPA • Tiene que ser sometida en un término no mayor de 30 días luego de la declaración presidencial. • Fecha de declaración: 22 de agosto de 2011 • Fecha límite: 21 de septiembre de 2011

  32. Solicitantetiene 60 díasdespués del Kickoff Meeting (KOM)paraidentificartodos los dañosrelacionados al desastre.

  33. Apelaciones • Los Solicitantes pueden apelar cualquier determinación de FEMA o del GAR. • El Solicitante debe radicar la apelación • en un término no mayor de 60 días • después de haber recibido la • notificación de la acción que motiva la • apelación.

  34. Proyectos Grandes vs. Pequeños Año Fiscal 2010(1ro de octubre de 2009 al 30 de septiembre de 2010) • Proyectos grandes • $63,200 o más: • Proyectos pequeños • $63,200 o menos:

  35. Proceso de Desembolso FEMA aprueba proyecto GAR Grantee Municipio Subgrantee

  36. ¿Alguna Pregunta?

More Related