Shoals Marine Lab Wind Turbine Construction, June 2007. William E. Bemis Kingsbury Director. Parts for the tower arrived in the evening of June 21. We transferred tower components to the barge. We barged them to the high tide pier for unloading. Ross Hansen is sitting on the counterweight.
E N D
Shoals Marine Lab Wind Turbine Construction, June 2007 William E. Bemis Kingsbury Director
Generating electricity on day one: June 29, 2007. And that is not all…
SML’s Engineering Interns installing solar panels: July 2007.