Overview of King County Transit Signal Priority Program

Overview of King County Transit Signal Priority Program. T3 Webinar January 22, 2008. Transit Signal Priority Program Timeline. 1991 – Rainier Ave HOV study recommends demonstration of Transit Signal Priority 1993 – Regional Oversight Committee formed

Download Presentation

Overview of King County Transit Signal Priority Program

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Overview of King County Transit Signal Priority Program T3 Webinar January 22, 2008

  2. Transit Signal PriorityProgram Timeline • 1991 – Rainier Ave HOV study recommends demonstration of Transit Signal Priority • 1993 – Regional Oversight Committee formed • 1994-1996 – RFI, RFP, Contract Award • 1997 – System design approved • 1999 – Rainier Ave installation • 2000 – Aurora Ave installation • 2002 – Final acceptance & Aurora Ave evaluation

  3. System Requirements • Conditional priority • Data message • Decentralized operation • Work with multiple signal controller types • Minimal disruption to general Traffic • Limited call frequency • Must serve all phases • No driver interaction

  4. King County TSP System • Detection • RF Tag Reader • 500 - 1,000 feet • Request • TPRG in signal cabinet • Conditional priority

  5. TSP Transponder “Tag” • 128 bit packet: • system • agency • vehicle ID • driver ID • route • run • trip • class • lateness • ridership • No input by driver required. static data dynamic data future use

  6. TSP Reader • RF antenna mounted above roadway • Reader detects tag, reads data packet and passes information to TPR Generator

  7. TPR Generator • Interfaces with traffic controller • Determines if bus is eligible for priority • Stores logs and priority logic

  8. Current TSP Projects • Rainier Avenue • SR 99 North • SR 99 South • Bellevue 8th St. • 272nd / I-5 • Redmond (RITS) • NE 124th St. • Renton TSP • Lake City Way • 1st Avenue South • Jackson St/12th Ave. • E-3 Busway to CBD

  9. Average reduction in bus travel peak period: Average reduction in bus delay at signalized intersections: Reduction in buses with travel time >30 min: 5.5% 25% 40% TSP Evaluation Findings

  10. TSP impacts on reliability are as important as speed Communication quality is critical RFID is effective, but complex and a large share of installation and maintenance cost No one cares more about Transit Signal Priority than Transit TSP Lessons Learned