30 likes | 139 Views
USQCD ILDG Data Generation Plans. MILC (UKQCD coordination) Asqtad Nf = 2+1 a = 0.09 fm 40^3 x 96 m_ud = 0.1 m_s Asqtad Nf = 2+1 a = 0.06 fm 48^3 x 144 m_ud = 0.4 m_s and 0.2 m_s ILDG availability ASAP ~6 mo after hep-lat. USQCD ILDG Data Generation Plans.
E N D
USQCD ILDG Data Generation Plans • MILC (UKQCD coordination) • Asqtad Nf = 2+1 • a = 0.09 fm • 40^3 x 96 • m_ud = 0.1 m_s • Asqtad Nf = 2+1 • a = 0.06 fm • 48^3 x 144 • m_ud = 0.4 m_s and 0.2 m_s • ILDG availability ASAP ~6 mo after hep-lat
USQCD ILDG Data Generation Plans • LHPC (UKQCD coordination) • DWF 2+1 (tentative, after exploration) • 24^3 x 64 • m_pi ~ 350 MeV/c^2 • ILDG availability under discussion
USQCD ILDG Data Generation Plans • RBC • DWF Nf = 2+1 (UKQCD coordination) • a = 1.1fm • 24^3 x 64 • m_ud >= 0.2 m_s • P4 staggered Nf = 2+1 (Bielefeld coord.) • N_t = 4, 6 N_s = various • m_ud small • ILDG availability 6 months after hep-lat.