1 / 53

Make to Stock (MTS) vs. Make to Order (MTO)

Make to Stock (MTS) vs. Make to Order (MTO). Made-to-stock (MTS) operations. Product is manufactured and stocked in advance. Safety inventory protects against stockouts due to variability of arrival time and processing time. Inventory also permits economies of scale.

bridie
Download Presentation

Make to Stock (MTS) vs. Make to Order (MTO)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Make to Stock (MTS) vs. Make to Order (MTO) Made-to-stock (MTS) operations. Product is manufactured and stocked in advance. Safety inventory protects against stockouts due to variability of arrival time and processing time. Inventory also permits economies of scale. Make-to-order (MTO) operations. Each order is specific, cannot be stored in advance. Ex. banks, restaurants, retail checkout counters, airline reservation, hospitals , repair shops, call centres. Production systems also try to follow Dell Computer model. We needs to maintain sufficient capacity to deal with uncertainty in both arrival and processing time. Safety Capacity vs. Safety Inventory.

  2. A Call Centre The Call Centre Process Sales Reps Processing Calls (Service Process) Incoming Calls (Customer Arrivals) Answered Calls (Customer Departures) Calls on Hold (Service Inventory) Blocked Calls (Due to busy signal) Abandoned Calls (Due to long waits) Calls In Process (Due to long waits)

  3. Characteristics of Waiting Lines (Queuing Systems) • The time of the arrival of an order is not known ahead of time. It is a random variable with estimated mean and standard deviation. • The time of the next telephone call is not known. • The service time is not known (precisely) ahead of time. It is a random variable with estimated mean and standard deviation. • The time a customers spends on the web page of amazon.com is not precisely known. • The time a customer spends speaking with the teller in the bank is unknown

  4. Article: The Psychology of Waiting Lines • Unoccupied time feels longer than occupied time. • Pre-process waits feels longer than in-process waits. • Anxiety makes waits seem longer. • Uncertain waits are longer than known, finite waits. • Unexplained waits are longer than explained waits. • Unfair waits are longer than equitable waits. • The more valuable the service, the longer I will wait. • Solo waiting feels longer than group waiting.

  5. Characteristics of Queuing Systems • Variability in arrival time and service time leads to • Idleness of resources • Waiting time of customers (orders) to be processed • We are interested in evaluating two measures: • Average waiting time of flow units. Average waiting time in the waiting line and in the system (Waiting line + Processor). • Average number of flow units. The average number of orders (customers) waiting in the waiting line (to be then processed). • Let us first look at the Servers or Processors

  6. AVERAGE Processing Time TpAVERAGE Processing Rate Rp Tp: Processing time. Tpunits of time. Ex. on average it takes 5 minutes to serve a customer. Rp: processing rate. Rpflow units are handled per unit of time. If Tp is 5 minutes. Compute Rp. Rp= 1/5 per minute, or 60/5 = 12 per hour.

  7. More than One Server; c Servers Tp: processing time. Rp: processing rate. What is the relationship between Rp and Tp? If we have one resource  Rp= 1/Tp What is the relationship between Rp and Tp when we have more than one resource; We have c recourses Rp= c/Tp Each customer always spends Tp unites of time with the server

  8. Average Processing Rate of c Servers Tp= 5 minutes. Processing time is 5 minute. Each customer on average is with the server for 5 minutes. c = 3, we have three servers. Processing rate of each server is 1/5 customers per minute, or 12 customer per hour. Rp is the processing rate of all three servers. Rp = c/Tp Rp= 3/5 customers/minute, or 36 customers/hour.

  9. Inter-arrival Time (Ta) and Arrival Rate (Ra) Ta:customer inter-arrival time. On average each 10 minutes one customer arrives. Ra:customer arrival (inflow) rate. What is the relationship between Ta and Ra Ta = every ten minutes one customer arrives How many customers in a minute? 1/10;Ra= 1/Ta= 1/10 Ra = 1/10 customers per min; 6 customers per hour Ra= 1/Ta

  10. Throughput = Min (Ri,Rp) Ra MUST ALWAYS <= Rp. We will show later that even Ra=Rp is not possible. Incoming rate must be less than processing rate. Throughput = Flow Rate R = Min (Ra, Rp) . Stable Process = Ra< RpR = Ra Safety Capacity Rs = Rp – Ra

  11. Buffer (waiting line) and Processors (Servers) What is the waiting time in the servers (processors)? Throughput? Flow time T = Ti+ Tp Inventory I = Ii + Ip Ti: waiting time in the inflow buffer Ii: number of customers in the inflow buffer

  12. Utilization is Always Less than 1 U = Utilization U =inflow rate / processing rate U = throughout / process capacity U = R/ Rp < 1 Safety Capacity = Rp– R For example , R = 6 per hour, processing time for a single server is 6 min  Rp= 12 per hour, U = R/ Rp = 6/12 = 0.5 Safety Capacity = Rp– R = 12-6 = 6

  13. Given the Utilization, How Many Flow Units are in the Processor(s) Given a single server. And a utilization of U= 0.5 How many flow units are in the server ? • U = 0.5 means • 50% of timethere is 1 flow unit in the server • 50% of time there is 0 flow unit in the server • 0.5  1 + 0.5  0 = 0.5 • Average Inventory in the server is equal to utilization • Ip= 1U = U

  14. Given the Utilization, How Many Flow Units are in the Processor(s) • U = 0.5 means • 50% of timethere is 1 flow unit in each server • 50% of time there is 0 flow unit in each server • 0.5  1 + 0.5  0 = 0.5 flow unit in each server • Average Inventory in the server is equal to utilization timesthe number of servers Ip= 2U = cU • Given 2 servers. And a utilization of U = 0.5 • How many flow units are in the servers ?

  15. What We Have Learned Without Looking for any Formula Processing time: Tp, Ex. Tp = 5 minutes Number of servers: c, Ex. c=3 Tp is also waiting time in the server, no mater one server or c servers. Tp in this example is always 5 min. Processing rate Rp= c/Tp. Ex. Rp =3/5 per min; 36/hr Utilization: U. Ex. U = 0.8 in our example Number of the flow units in all servers, Ip = cU In our example, Ip = 3  0.8 = 2.4 Can we compute R?  TR = I Tp R = cU R = cU/Tp 5 R = 2.4  R = 0.48 flow units per minute or 28.8 / hr We learned it without looking at any formula

  16. Characteristics of Queuing Systems • Variability in arrival time and service time leads to • Idleness of resources • Waiting time of customers (orders) to be processed • We are interested in evaluating two measures: • Average waiting time of flow units. Average waiting time in the waiting line and in the system (Waiting line + Processor). • Average number of flow units. The average number of orders (customers) waiting in the waiting line (to be then processed).

  17. Utilization and Variability • Two key drivers of process performance are Utilization and Variability. • The higher the utilization the longer the waiting line. • High capacity utilization U= R/Rp or low safety capacity Rs =R –Rp, due to • High inflow rate R • Low processing rate Rp = c / Tp, which may be due to small-scale c and/or slow speed 1 /Tp • The higher the variability, the longer the waiting line.

  18. Drivers of Process Performance • Variability in the interarrival time and processing time can be measured using standard deviation. Higher standard deviation means greater variability. • Coefficient of Variation: the ratio of the standard deviation of interarrival time (or processing time) to the mean. • Ca = coefficient of variation for interarrival times • Cp = coefficient of variation for processing times

  19. Now Let’s Look at the Rest of the System; The Little’s Law Applies Everywhere R • Flow time T Ti+ Tp • Inventory I = Ii + Ip Ip= R  Tp I = R T Ii = R Ti R = I/T = Ii/Ti = Ip/Tp We have already learned Rp = c/Tp U= R/Rp = Ip/c

  20. Operational Performance Measures Flow time T = Ti+ Tp Inventory I = Ii + Ip Ti: waiting time in the inflow buffer = ? Ii: number of customers waiting in the inflow buffer =? • A set of excel sheet are provided at the end of this lecture. • We relay on the approximation formula, given shortly, and our understanding of the waiting line logics. • We also provide an exact table for a special case.

  21. The Queue Length APPROXIMATION Formula • U= R/Rp,whereRp = c / Tp • Caand Cp are the Coefficients of Variation • Standard Deviation/Mean of the inter-arrival or processing times (assumed independent) Utilization effect U-part Variability effect V-part

  22. Factors affecting Queue Length This part captures the capacity utilization effect. It shows that queue length increases rapidly as U approaches 1. • This part captures the variability effect. The queue length increases as the variability in interarrival and processing times increases. • Even if the processing capacity is not fully utilized, whenever there is variability in arrival or in processing times, queues will build up and customers will have to wait.

  23. Utilization – Variability - Delay Curve Average Time in System T Variability Increases Tp 100% U Utilization (U)

  24. Lessons Learned • If inter-arrival and processing times are constant, queues will build up if and only if the arrival rate is greater than the processing rate. • If there is (unsynchronized) variability in inter-arrival and/or processing times, queues will build up even if the average arrival rate is less than the average processing rate. • If variability in interarrival and processing times can be synchronized (correlated), queues and waiting times will be reduced.

  25. Coefficient of Variations for Alternative Distributions

  26. Exact Ii for Poisson Arrival Rate, Exponential Service Time

  27. Terminology and Classification of Waiting Lines Terminology: The characteristics of a queuing system is captured by five parameters; Arrival pattern, Service pattern, Number of server, Restriction on queue capacity, The queue discipline. • M/M/1; Poisson arrival rate, Exponential service times, one server, No capacity limit. • M/G/12/23; Poisson arrival rate, General service times, 12 servers, Queue capacity is 23

  28. Example; Coefficient of Variation of Interarrival Time A sample of 10 observations on Interarrival times in minutes  10,10,2,10,1,3,7,9, 2, 6 minutes. =AVERAGE ()  Avg. interarrival time = 6 min. Ra= 1/6 arrivals / min. =STDEV()  Std. Deviation = 3.94 Ca = 3.94/6 = 0.66 C2a = (0.66)2 =0.4312

  29. Example: Coefficient of Variation of Processing Time A sample of 10 observations on Processing times in minutes  7,1,7 2,8,7,4,8,5, 1 minutes. Tp= 5 minutes Rp = 1/5 processes/min. Std. Deviation = 2.83 Cp = 2.83/5 = 0.57 C2p = (0.57)2 = 0.3204

  30. Example: Utilization and Safety Capacity Ra=1/6 < RP =1/5  R = Ra U= R/ RP = (1/6)/(1/5) = 0.83 With c = 1, the average number of passengers in queue is as follows: Ii = [(0.832)/(1-0.83)] ×[(0.662+0.572)/2] = 1.56 On average 1.56 passengers waiting in line, even though safety capacity is Rs= RP - Ra= 1/5 - 1/6 = 1/30 passenger per minute, or 2 per hour.

  31. Example: Other Performance Measures Waiting time in the line? Ti=Ii/R = (1.56)(6) = 9.4 minutes. Waiting time in the system? T = Ti+Tp Since Tp= 5  T = Ti+ Tp= 14.4 minutes Total number of passengers in the process is: I = RT = (1/6) (14.4) = 2.4 Alternatively, 1.56 in the buffer. How many in the process? I = 1.56 + 0.83 = 2. 39

  32. Example: Now suppose we have two servers. Compute R, Rp and U: Ta= 6 min, Tp = 5 min, c=2 R = Ra= 1/6 per minute Processing rate for one processor 1/5 for 2 processors Rp = 2/5 U = R/Rp = (1/6)/(2/5) = 5/12 = 0.417 On average 0.076 passengers waiting in line. safety capacity is Rs= RP - Ra= 2/5 - 1/6 = 7/30 passenger per minute, or 14 passengers per hour

  33. Other Performance Measures for Two Servers Other performance measures: Ti=Ii/R = (0.076)(6) = 0.46 minutes Compute T? T = Ti+Tp Since TP = 5  T = Ti + Tp= 0.46+5 = 5.46 minutes Total number of passengers in the process is: I= 0.08 in the buffer and 0.417 in the process. I = 0.076 + 2(0.417) = 0.91

  34. Processing Time, Waiting Time; Long Waiting Line Ra =R= 10/hour Tp= 5 minutes Interarrival time Poisson Service time exponential Ra = 10/hour Increasing Capacity Polling

  35. More Servers + Specialization Ra/2 = 10/hour Ra/2 = 10/hour

  36. Polling: Lower Waiting Time, Longer Processing Time (Perhaps) Ra = 10/hour

  37. Effect of Pooling Ra =R= 10/hour Tp= 5 minutes Interarrival time Poisson Service time exponential Ra/2 Server 1 Queue 1 Ra Ra/2 Server 2 Queue 2 Server 1 Ra Queue Server 2

  38. Effect of Pooling : 2M/M/1 Ra/2 Server 1 Ra/2 = R= 5/hour Tp= 5 minutes c = 1  Rp = 12 / hour U= 5/12 = 0.417 Queue 1 Ra Ra/2 Server 2 Queue 2

  39. Comparison of 2M/M/1 with M/M/2 Ra/2 Server 1 Queue 1 Ra Ra/2 Server 2 Queue 2 Server 1 Ra Queue Server 2

  40. Effect of Pooling: M/M/2 Ra=R= 10/hour Tp= 5 minutes c = 2 Rp = 24 /hour U= 10/24 U= 0.417 AS BEFORE for each processor Server 1 Ra Queue Server 2

  41. Effect of Pooling • Under Design A, • We have Ra = 10/2 = 5 per hour, and Tp = 5 minutes, c =1, we arrive at a total flow time of 8.6 minutes • Under Design B, • We have Ra =10 per hour, Tp= 5 minutes, c=2, we arrive at a total flow time of 6.2 minutes • So why is Design B better than A? • Design A the waiting time of customer is dependent on the processing time of those ahead in the queue • Design B, the waiting time of customer is partially dependent on each preceding customer’s processing time • Combining queues reduces variability and leads to reduce waiting times

  42. Performance Measures • Financial Performance Measures • Sales: Throughput Rate • Cost: Capacity utilization, Number in queue / in system • Customer service: Waiting Time in queue /in system • Performance Improvement Levers • Decrease variability in customer inter-arrival and processing times. • Decrease capacity utilization. • Synchronize available capacity with demand.

  43. 1. Variability Reduction Levers • Customers arrival are hard to control • Scheduling, reservations, appointments, etc…. • Variability in processing time • Increased training and standardization processes • Lower employee turnover rate  more experienced work force • Limit product variety, increase commonality of parts

  44. 2. Capacity Utilization Levers • If the capacity utilization can be decreased, there will also be a decrease in delays and queues. • Since U=R/Rp, to decrease capacity utilization there are two options • Manage Arrivals: Decrease inflow rate Ra • Manage Capacity: Increase processing rate Rp • Managing Arrivals • Better scheduling, price differentials, alternative services • Managing Capacity • Increase scale of the process (the number of servers) • Increase speed of the process (lower processing time)

  45. 3. Synchronizing Capacity with Demand • Capacity Adjustment Strategies • Personnel shifts, cross training, flexible resources • Workforce planning & season variability • Synchronizing of inputs and outputs, Better scheduling

  46. The M/M/c Model EXACT Formulas

  47. The M/G/1 Model EXACT Formulas

  48. The M/G/1 Model EXACT Formulas

  49. Assignment 1: M/M/1 Performance Evaluation Example: The arrival rate to a GAP store is 6 customers per hour and has Poisson distribution. The service time is 5 min per customer and has Exponential distribution. • On average how many customers are in the waiting line? • How long a customer stays in the line? • How long a customer stays in the processor (with the server)? • On average how many customers are with the server? • On average how many customers are in the system? • On average how long a customer stay in the system?

  50. Assignment 2: M/M/1 Performance Evaluation • What if the arrival rate is 11 per hour?

More Related