An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Roma, 1 december 2006 Rete Ferroviaria Italiana Track Maintenance Ing. Matteo Triglia

  2. Network • Situation • 16.000 km of line, two third electrified and 6.300 km double-track line (with 22.000 km of main line) • About 30.000 km of total track and 44.000 switches • About 1.900 plants for the regulation of the trains circulation and 20.000 km of track equipped with systems of automatic block for the spacing of trains • More then 1.500 km of tunnels, 530 km of bridges and viaducts, 9.000 km of power lines, 385 power station and substation • Cost about 1 M. €/ year • Increasing uncertainties on financing • Effect turnover on the competences • Discontinuity of perimeter: Entry of AV / AC network • Discontinuity of content: insertion of new technologies • increase of plants maintenance Network and Situation

  3. Attended impact • Assigned objectives • Containment of the costs • Improvement of the reliability and the safety • Increase of the availability of the track • Management of the new technologies and the lines AV / AC • Increase of the productivity of personal • Reduction of maintenance cost of the traditional network for contracted activity • Improvement of the indexes of unavailability of the infrastructure • Increase of maintenance cost for new technologies and lines AV/AC Objectives

  4. Infrastructure Structure 16.000 km of line (6.300 double track) 1.255 km of tunnels 530 km of bridges and viaducts 9.000 km of power lines 385 stations and sub-stations 3 national workshops

  5. Infrastructure Structure • Type of line • Type A – Main Line with heavy traffic (intensity, speed and major maintenance standard) • Type B – Main Line (long distance line for national and international traffic) • Type C – secondary electrified line • Type D – not electrified line

  6. Infrastructure Structure LINE km LINE km TRACK TYPE A 1.275 2.550 TYPE B 5.120 9.320 TYPE C 4.300 4.936 TYPE D 5.325 5.362 TOTAL NETWORK 16.020 22.168 JUNCTION AND FREIGHT LINE 1.000 OTHER TRACK 8.000 TOTAL TRACK 31.168 ELECTRIC POWER SUPPLY 3000 V c.c. LINE ELECTRIFIED km 10.695 MAIN TRACK ELECTRIFIED km 16.086 LINE NOT ELECTRIFIED km 5.395 MAIN TRACK NOT ELECTRIFIED km 5.362 km 16.020 TOTAL km22.168 TOTAL

  7. 12000 10000 8000 6000 double track single track 4000 2000 0 LINE LINE LINE LINE TOT. A B C D 1256 4306 655 53 6270 double track 3 838 3884 4881 9606 single track Infrastructure Structure Km of Line

  8. 14000 12000 10000 8000 double track 6000 single track 4000 2000 0 LINE LINE LINE LINE TOT. A B C D 2511 8611 1310 105 12537 Double track 3 838 3884 4881 9606 Single track Infrastructure Structure Km Main Line

  9. Infrastructure Structure Switches

  10. CdL Tech. Control Objects of Maintenance Standard Activity Quartly Programme Weekly Programme Execution Annual Planning State of Track Economicalcontrol Diagnostic Advices Intervals Slowing down List of Material Form - PM Attività Negoziale Contract Management Goods Entry - Store Management Goods Management Form - MM Suppliers Register BW-Pianning DW-Maintenance Controllo Tecnico Steps of Maintenance Process and Logistic

  11. Informatics system Plan the maintenance Programme the resources Manage spare parts and technical material Study and remove the breakdowns The engineering of maintenance

  12. Precise planning In the way of maintenance “on condition” • Support with managerial informatics tools the visits to the work sites and the consequent technical relief's. • Relationship with suppliers of equipments and plants that are involved in the Maintenance during the life cycle. • Certify the service. Evolution of maintenance

  13. “Diagnostic" is the activity directed to determine “health condition" of the differentcomponents of the railwayinfrastructure in order to: guarantee the safety of the exercise prevent the breakdowns address maintenance resources where is recorded a degrade of geometric characteristics and/or of the infrastructure operation parameters incompatible with the desired service level (maintenance “on condition”) Diagnostic

  14. The virtuous diagnostic circle - maintenance ATTIVITA DI DIAGNOSTIC MEASURING VEHICULES MEZZI DI MISURA DIAGNOSTICA ACTIVITY Immediate intervention Intervento immediato Treno Archimede Archimede Train • • Controllo completo infrastruttura Complete infrastructure control o or linee A e principali B line A & mainly B Analyse Analisi of data dati e Talete Talete - - Aldebaran Aldebaran • • Relief geometry & rail corrugation & Rilievo geometria e usura binario e linea di contatto linee C e restanti B Overhead line on line C & other B insertion in SIM immissione nel SIM PV7 , EM80 PV7 , EM80 • • Relief geometry line D Rilevo geometria binario linee D Carrellini informatizzati Informatics trolley • • Rilievo parametri geometrici binario Reilief track geometric parameters & switches e deviatoi Treno Galileo e rivelatori Galileo train & portable • • Relief with US of rails defects Rilievi a US dei difetti interni alle rotaie portatili indicator Programme Programmazione with SIM tramite SIM Esecuzione Execution mediante By means of manutenzione maintenance Trunks, Zones, Mechanized work site, Tronchi, Zone, Cantieri Meccanizzati, “on condition” on condition Contracts Appalti

  15. DATAWAREHOUSE MAINTENANCE COAMI PM PM DMS PM SEDE TECNICA • Advices • Quality index • Track geometric registration • Track defects SEDE TECNICA SEDE TECNICA Planning - Programme Punto di Misura Punto di Misura Measuring documents Work Orders Uultrasonic reg. Operational flow for the Diagnostic of the Infrastructure Visite Structures Reports Breakdown Transform the data in information Diagnostic System Diagnostic Trains Parameters registration

  16. InfraManagerSystem of decisional support for the infrastructure maintenance

  17. Chain of maintenance management based on diagnostic SCHEDULING EXECUTION MONITORING ANALISES PLANNING • Track Geometry • Rail Profile • Ballast • Sleepers • Catenaries Geometry • Wear of OHL • … • Interventions • Work planning • Breakdown • Defects • Quality index • RAM Indicator • Statistics data • AREA TO BE OPTIMIZED Evaluation of quality Proposal of work M/R Measuring Elaborate work orders

  18. Chain of maintenance management based on diagnostic MONITORING MONITOR ANALISES ANALISI OPTIMIZATION OPTIMIZATION SCHEDULING SCHEDUL EXECUTION E PIANNING PL - - Avarie Breakdown - - Degrade Velocit à di degrado speed - - Geometria Track Geometry Binario - - Defects Difetti - - Old age Vetust à - - Rail Profile Profilo Rotaia - - Indici Quality Index Qualit à - - Storico Work lavori register - - Ballast Ballast - - Intervention Interventi - - RAM Indicator Indicatori RAM - - Efficacia Work Efficiency lavorazione - - Sleepers Traverse - - Scadenza Work Planning Lavori - - Statistics Data Dati statistici - - Intervention Frequenza frequency interventi - - Geometria OHL Geometry catenaria - - Advices Avvisi - - Costi Costs - - Wear of OHL Usura filo - - Traffic Traffico - - … … Work M Measuring Evaluation of Scenario Scenario Proposal of Elaborate Register quality ottimizzato ottimizzato work Work orders

  19. OUTPUT INTERMEDIATE ENTRY ELABORATION OPTIMISATION FINAL OUTPUT • Algorithms of Technical and Economical Optimisation: • - Grouping works on spatial and temporary base • elimination of ordinary intervention in proximity of renewal • - Works distribution in accordance to the priorities and the ties of the railway exercise Diagnostic Data Algorithms of work forecast: - overcoming thresholds - Degrade speed Track Basic Data's • Tamping • Ballast Cleaning • Rail renewal • Renewal ballast Rail Sceneries of intervention Executed work Sleeper Cost and bonds Ballast Finished work Definition of Maintenance intervention

  20. Diagnostic and extraordinary maintenance The practice of track renewal is tied up to considerations on life duration of the track or to directives of technical standardization (ex.: 60 UNI, Pandrol fastening,elimination of wood sleepers, etc.).These considerations can always be additional to the results of the mobile diagnostic that these are considered on a sufficient long term (1-2 years). The analysis of these elements is facilitated by the recent insertion in the SIM. Diagnostic

  21. The internal defects registered with US The consistence, registered on the network, of the rails inside defects pointed up with the ultrasounds furnishes an important element of evaluation on the necessities of extraordinary maintenance of one determined section of track. When in fact on a section of track are present many defects that exceeds a determined limit, it can economically result more convenient, from the point of view of the operational costs, to plan a generalized renewal of rails in that section. Diagnostic

  22. RFI main activity • inspection and control of the entire network with the “mobile diagnostic” • intervention in case of abnormality’ • Intervention of ordinary maintenance • protection of work site • Intervention of maintenance (levelling and lining of track and switches, bush cutting, general overhaul, substitution of rails and sleepers) • Inspection of outsourced work

  23. Main activity of track work Contractors • Intervention of extraordinary maintenance and renewal • Intervention of ordinary and/or complete maintenance (rail grinding, levelling and lining of track and switches, bush cutting, general overhaul, extended to rail and sleepers substitution) • Urgent intervention

  24. Outsourced Track Work RFI, for the outsourced track work, has organized two "contract type", both of more years validity: the one, with jurisdiction to level of the whole network, divided in one or more territorial lots, for the trust of important track work including, track renewal, systematic ballast cleaning, total sleepers substitution, etc. the other one, with jurisdiction to level of Infrastructure Compartment Direction, for the trust of the track work of ordinary maintenance, finalized in containment of the normal defects (revision, leveling, etc.) ;

  25. Outsourced Track Work • Both contracts have the objective of: • to avoid the fragmentation of the performers, giving responsibility to the contractors in terms of ability technical / executive and of business organization, with particular respect to the quality of the performed performances; • to harmonies behaviors to the whole network; to plan middle term interventions through a single tender, guaranteeing to the trackwork contractors a stability of the orders and favoring, at the same time, the modernization of the equipments and the improvement of the business organization.

  26. Outsourced Track Work For both contract type, the execution of the intervention is in quality assurance, accordingly to the standards ISO 9000 and in respect to the documents "Plain of Quality." For the performance quality, the contractor, during the operational phases and before reactivation to the exercise of the track under maintenance, must verify the quality of the performed work reporting the result on special forms released by RFI.

  27. Outsourced Track Work The track works are contracted to subjects in possession of RFI qualification certificate to the "System of Qualification of the railway trackwork Contractors" and, if required to the "System of Qualification of Suppliers of concrete sleepers", that participates in an association of enterprises (ATI, constitute of trackwork Contractors and manufacturers of the materials). This in order to guarantee a coordination of the productivity and performance and of the oneness of the responsible interlocutor.

  28. Outsourced Track Work Furthermore, to the level of whole Network with a three year contract, are performed interventions of rail grinding, type corrective, for about 700 km/year of track on lines of group A, B and C for elimination of defects of short and long wave. Such interventions are performed in programmed possession of track of about 3 hours. The quality of the performed work is valued through a quality index that foresees the remaking of intervention in case it is not satisfied.

  29. YEAR ANNO km TRACK km BINARIO N N ° ° SWITCHES DEVIATOI 1999 1999 560 560 700 700 2000 2000 1.150 1.150 900 900 2001 2001 1.100 1.100 860 860 2002 2002 1.050 1.050 800 800 2003 2003 560 560 700 700 2004 2004 800 800 730 730 2005 2005 440 440 750 750 2006 2006 670 670 650 650 Outsourced Track Work Quantity of work performed in the years 1999 to 2006 in extraordinary maintenance

  30. YEAR ANNO km TRACK km BINARIO N N ° ° SWITCHES DEVIATOI 2007 2007 500 500 600 600 2008 2008 450 450 650 650 2009 2009 450 450 600 600 Planned track work Amount of planned track renewal for the years 2007, 2008 and 2009 in extraordinary maintenance

  31. Control of Contractors track work • Special actions have been taken in the following sectors: • improvement of the competences of the personnel of the contractors; • certification of the performed work; • establishment of a systematic inspection activity on the track work site.

  32. QUALIFICATION OF CONTRACTORS PERSONNEL ABILITAZIONI PERSONA LE IMPRESE APPALTATR ICI sector settore EXECUTIVE FUNCTION OF MANSIONI ESECUTIVE D ELLA PROTEZIONE CANT WORK SITE PROTECTION IERI ALL TUTTI “alluminotermic welding” according Procedure “Saldatura alluminotermica” definita nella C ircolare DI.TCAR.CI.AR.07.001.A del 21 marzo 2000 DI.TCAR.CI.AR.07.001.A of 21 march 2000 – – “Qualification of “Abilitazione per ARM ARM l’esecuzione di saldature alluminotermiche di rotaie per il personale Contractors Alluminotermic welders” dipendenti da Imprese Appaltatrici”. nuova new DRIVERS OF CONTRACTORS TRACKWORK MACHINES GUIDA DEI MEZZI D’OP ERA DI PROPRIETA’ DELLE I. . A. ALL TUTTI ARMDITTE ( ARMDITTE ( Proc. RFI DMA Proc. RFI DMA - - DTC PS IFS 012 A del 03.03.2004) DTC PS IFS 012 A of 03.03.2004) ARM ARM Control of Contractors track work COMPETENCES OF CONTRACTORS PERSONNEL The qualification of the Contractors personnel that operates in maintenance activity of the railway infrastructure has been organized in only one system:

  33. Control of Contractors track work CERTIFICATION OF THE PERFORMED WORK • The Terms of Contract for work in presence of the railway exercise prescribes that the contractor must perform the Quality Control of the work before the reactivation of the track to the exercise, with particular attention to those work that have importance with the Safety of the exercise. • Such controls must be documented through specific forms for the followings work: • Renewal of track/total substitution of sleepers • Ballast cleaning • Renewal of switches and crossings

  34. Relationship with Contractors Association Considering the high investments in the activity of track work, RFI considers of fundamental importance the relationship with l’Associazione Nazionale Imprese Armamento Ferroviarie (ANIAF). A major reason with the European Federation of Track Work Contractors (EFRTC)

  35. Relationship with Contractors Association • Relationship with the Association allows to: • better comprehension between client and supplier • increase capacity/potentiality in carrying out of work • seek/increase methodology for a better quality of the executed work • Optimise the track work cost • reduce the subjections to the railway exercise, in terms of time possession • improve the safety of the railway exercise and the personnel involved in the work site • promote use of high performance machines