Hybrid Control of DG to Mitigate Voltage Variation

Hybrid Control of DG to Mitigate Voltage Variation. Aristides Kiprakis Dr Robin Wallace University of Edinburgh, UK. Automatic Voltage / Power Factor Control (AVPFC). Active exchange between constant voltage and constant Power Factor (PF) modes Operates in a defined voltage / PF envelope

brilliant
Download Presentation

Hybrid Control of DG to Mitigate Voltage Variation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Hybrid Control of DG to Mitigate Voltage Variation Aristides Kiprakis Dr Robin Wallace University of Edinburgh, UK

  2. Automatic Voltage / Power Factor Control (AVPFC) • Active exchange between constant voltage and constant Power Factor (PF) modes • Operates in a defined voltage / PF envelope • Increases exported energy • min disconnection period from over-voltage • Can provide voltage support • Low cost implementation

  3. Research Updates - I • Combined AVPFC & Voltage Regulator (VR) • major increase in allowable generator capacity • VR under MVAr flow control mode rather than Line Voltage Rise Compensation mode • Developed controller operating at continuous PF that increases exported energy • Fuzzy controller observes the terminal voltage and adjusts the PF set-point accordingly

  4. Research Updates - II • DG capacity was further increased by applying similar fuzzy controller to governor • Can also be combined with a Voltage Regulator to increase DG capacity even more

  5. Technology Availability • Developed several potential solutions • Proof of Concept models being built to prove feasibility • However… • generator manufacturers must implement them • plant developers must use them and, ultimately, • DNOs need to allow their use in the network

  6. CIRED 2003 • This work is part of a larger ongoing programme at the University of Edinburgh • Papers presented at CIRED • 4.44 - Intelligent generator control • 4.62 - Domestic CHP • 4.63 - Optimal accommodation of DG