140 likes | 247 Views
TPC Very High Voltage Control. Status report. 20/04/2006. Marco Boccioli. Summary. PLC control and communication routines implemented and tested PVSS interface implemented Safety features tested System being installed at P2 Draft technical note: \pcaitdc21shareTPC.
E N D
TPC Very High Voltage Control Status report 20/04/2006 Marco Boccioli
Summary • PLC control and communication routines implemented and tested • PVSS interface implemented • Safety features tested • System being installed at P2 • Draft technical note: \\pcaitdc21\share\TPC
Safety • Electrical safety checked • PLC safety routines tested
Installing the system Supervisory • PVSS with FSM • Schneider OPC server
Installing the system PLC • Schneider Electric Premium P57 5634M
Installing the system Power Supply • Heinzinger PNC 150000
Installing the system ELMB • One for each side
Installing the system Cabling • Seven points for each side
What next… • End the cabling • Test the installed system • Integrate the FSM with DCS • Release the technical note (\\pcaitdc21\share\TPC)