Small MS4 General Permit Renewal (OHQ000002) Jason Fyffe Ohio EPA Central Office

Small MS4 General Permit Renewal (OHQ000002) Jason Fyffe Ohio EPA Central Office. Timeline. Public Noticed GP Renewal . GP Renewal Issued. Public Hearing. Public Comment Period Ended. 1 st Generation GP Expired. MS4 Locations. 472 MS4s. Renewing Coverage. NOI $200

brilliant
Download Presentation

Small MS4 General Permit Renewal (OHQ000002) Jason Fyffe Ohio EPA Central Office

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Small MS4 General Permit Renewal (OHQ000002) Jason Fyffe Ohio EPA Central Office

  2. Timeline Public Noticed GP Renewal GP Renewal Issued Public Hearing Public Comment Period Ended 1st Generation GP Expired

  3. MS4 Locations

  4. 472 MS4s

  5. Renewing Coverage • NOI • $200 • Updating SWMP

  6. Renewing Coverage • Co-Permittee Form • No Additional Fee

  7. Pollution Prevention/Good Housekeeping for Municipal Operations 6 Minimum Control Measures Public Education & Outreach Post-Construction Runoff Control Construction Site Runoff Control Public Involvement/ Participation Illicit Discharge Detection/Elimination

  8. Table of Organization

  9. > 1 mechanism & target ≥ 5 storm water themes or messages 1 theme targeted to development community ≥ 50% of population ≥ 5 public involvement activities Public Education & Outreach Public Involvement/ Participation Timeframe - Over Permit Term

  10. IDDE • Expanded Mapping Reqts • Catch basins • Pipes & ditches • Flood control facilities • WQ BMPs • Private WQ BMPs • Timeframe • Permit term, or • Provide alternative schedule with 2009 annual report

  11. IDDE • HSTSs Discharging to MS4 • Work with local waste water authorities, planning agencies, BOHs, etc. – planning, future sewers • Implement proactive O&M program to determine if operating as designed & intended • Identify HSTSs that can legally, feasibly and economically be connected to sewers

  12. IDDE What is an illicit discharge? “…any discharge to an MS4 that is not composed entirely of storm water, except for fire-fighting activities and NPDES permitted discharges.” • Dry-weather screening • Schedules to eliminate illicit discharges • Annually update MS4 map if needed

  13. Construction/Post-Construction • Ordinance • Equivalent with NPDES CGP • Construction Projects ≥ 1 acre • Review SWP3 • Inspections • Initial & monthly thereafter unless priorities developed • Post-Const WQ BMPs • Ensure long-term O&M plans developed & agreements in place • Timeframe – 2 years

  14. Pollution Prevention/ Good Housekeeping • Industrial SWP3s • Within 2 years • Annual Employee Training

  15. www.epa.state.oh.us/dsw/storm Annual Reports 2008 Report 2009 – 2013 Reports

  16. ANY QUESTIONS?