60 likes | 264 Views
PIPELINE TRANS -SAHARA. DATA . Beni Saf. Flow rate : 18 up to 25 Billions m 3 /Year. From Warri (Nigeria) to Beni Saf (Algéria): Diameter: 56’’ Total length : 4400 km. Path : Nigeria - Niger - Algeria - Europe. Nigeria: 1000 Km Niger: 800 Km Algeria: 2600 Km .
E N D
PIPELINE TRANS -SAHARA DATA Beni Saf • Flow rate : 18 up to 25 Billions m3/Year • From Warri (Nigeria) to Beni Saf (Algéria): • Diameter: 56’’ • Total length : 4400 km Path : Nigeria - Niger - Algeria - Europe • Nigeria: 1000 Km • Niger: 800 Km • Algeria: 2600 Km • Joint venture (NNPC-SONATRACH): • Feasibility studies • Environment Impact Assessment Warri
Upstream Associated Gas Recovering Projects Since 1973 Existing Projects New Projects ANNABA ALGER JIJEL BEJAIA SKIKDA EL TAREF GUELMA TIPAZA TIZI OUZOU SETIF SOUK AHRAS CONSTANTINE ARZEW BOUIRA MUSTAGANEM AIN DEFLA ECH CHLEF OUM EL BOUAGUI ORAN M'SILA BATNA SIDI BEL ABBES BOU SAADA TIARET TEBESSA TELEMCEN DJELFA BISKRA SAIDA EL ARICHA LAGHOUAT AFLOU MECHERIA BORDJ NILI MESKAR HASSI R’MEL TOUGGOURT 1999 1985 AIN SEFRA OUED NOUMER HASSI MESSAOUD Guellala 1993 2005 1973 HBK 1993 1982 REB Benkahla 1993 BECHAR BIR RBAA Mesdar 2001 DAMRANE EL Gassi RKF NEZLA.N HBNS NEZLA 2002 Guassi Touil EL GOLEA HASSI TOUAREG RHOURDE EL KHLEF HASSI CHERGUI RHOURDE EL CHOUF 1983 Rhourde Nouss 2002 Mereksen BENI ABBES DRAA ALLAL 1983 Stah HAMRA TIMIMOUN ALRAR TABELBALA 1987 TFT 2001 Ohanet 1986 1995 Amassak Zarzaïtine Adrar 2004 ADRAR Edjeleh
Associated Gas Produced & Flared (1970-2001) Sonatrach & Parteners
NEW PROJECTS 2002-2006 Foreign Total cost currency Amount to be Projects * ( x 10 3 DA) component (106 $) recovered(M3 /d) Hassi R’Mel Associated gas recovery (CTH Phase 2) 7 200 000 72 4 000 000 - In Aménas 1 000 000 Associated gas recovery Edjeleh 2 734 000 28 - Gassi Touil 5 000 000 - Associated gas recovery 2 634 330 31 Hassi Messaoud 700 000 Extension LDHP CINA 1 886 557 18 - - 12 Condensate valorization 1292 000 3572 000 33 Crude Oil stabilisation unit Rhourde Nouss 491 000 Associated gas recovery - 600 000 1 Total 19 809 887 195 11 300 000 * Project to be delivered from 2002
2 000 5 1 800 1 600 4 During rehabilitation work Before rehabilitation 1 400 After rehabilitation Flared Gas / N,Gas input (%) 1 200 3 1 000 MM CM3 Eq, GN 800 2 1 270 1 166 1 129 600 897 787 791 400 1 200 - 0 1993 1994 1995 1996 1997 1998 1999 2000 1 129 1 166 1 270 897 787 791 Flared Gas 4,1 4,3 4,0 2,8 2,3 2,3 Percentage of flared Gas / NG (%) Flared Gas SONATRACH-LTH facilities