An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AKSI PENANGANAN KAWASAN PERBATASAN SATKER PKPAM NTT TAHUN ANGGARAN 2013

  2. SEKTOR AIR MINUM • Kebutuhan Air Minum • Besarnya kebutuhan air minum di daerah perbatasan tidak hanya dihitung berdasarkan Jumlah Penduduk (domestik) yang ada di Perbatasan tetapi juga dihitung berdasarkan : • Fasilitas fasilitas (non domestik) yang akan dibangun di daerah perbatasan seperti : • Pos pos perbatasan (tentara dan imigrasi) • Kantor kantor pendukung • Ruang terbuka dan rest area • Pertokoan dll • Kebutuhan air dihitung berdasarkan jumlah orang/pegawai atau berdasarkan luas area terbangun • Jumlah orang yang melintasi batas yang memerlukan tempat beristirahat dan mandi • Kebutuhan air dihitung berdasarkan jumlah orang yang melintasi batas dalam satu hari ± 25 liter/org/hari

  3. Pos Perbatasan Dari ke 3 pos Perbatasan yang ada saat ini : PLB I : Motaain/Silawan PLB II : Turiskain PLB III : Metamauk/Motamasin Motaain merupakan pintu perbatasan utama (yang paling ramai) dan akses prasarana jalan yang ada adalah jalan nasional • 1. Motaain/Silawan • Kebutuhan air minum di pos perbatasan motaain dan sekitarnya merupakan yang terbesar dari ke 3 PLB yang ada. Kebutuhan untuk air minum diperkirakan mencapai 10 lt/det • Air bersih eksisting yang ada berasal dari 1 sumur bor kapasitas ± 4 lt/det digunakan untuk sebagian penduduk di Silawan • Diperlukan tambahan Kapasitas ± 6 lt/det • Karena air baku, air permukaan dan mata air tidak ada di lokasi atau disekitar lokasi pelayanan maka alternatif yang ada adalah sumur bor atau memanfaatkan air laut (perlu biaya dan OM yang lebih besar) • Diperlukan 2 Sumur bor baru dan Reservoir Distribusi)

  4. Rencana Skema Jaringan Motaain Res. 200 m3 Dia. 75 mm Dia. 100 mm Elevated Res. 200 m3 Dan Kantor PDAM Sbg Landmark Air Minum Dia. 75 mm Dia. 75 mm Dia. 75 mm Dia. 75 mm SB. 1 SB. 2 Kawasan Perbatasan Kawasan Permkiman SB. 3 Desa Silawan

  5. Rencana Skema Jaringan Motaain Pebatasan Kwsn Perm Res. 200 m3 Pelabuhan Atapupu Desa Silawan Desa Silawan

  6. Kebutuhan Biaya SPAM Motaain

  7. PETA LOKASI PENYEBARAN PAKET FISIK KAWASAN PERBATASAN KABUPATEN BELU USULAN T.A-2013 PENANGANAN FISIK KAWASAN PERBATASAN DESA SILAWAN, KEC. MOTAAIN, KAB. BELU PEMBANGUNAN JALAN LINGKUNGAN NILAI KONTRAK : Rp. 5.000.000.000 PENANGANAN FISIK KAWASAN PERBATASAN KAWASAN PINTU MOTAAIN 1. PEMBANGUNAN TEMBOK PENAHAN DAN BANGUNAN PELENGKAPNYA NILAI HPS : Rp. 10. 500.000.000 2. PEMBANGUNAN JALAN DUA JALUR DAN MEDIANYA NILAI HPS : Rp. 3. 536.000.000 3. PEMBANGUNAN SALURAN RIOL KOTA DAN JEMBATAN NILAI HPS : Rp. 3. 340.000.000 4. AREAL PELATARAN PARKIR PADA ANJUNGAN PANTAI NILAI HPS : Rp. 3. 578.000.000 5. PEMBANGUNAN JALAN UNTUK JALUR KENDARAAN NILAI HPS : Rp. 3. 674.000.000 6. PEMBANGUNAN JALAN LINGKUNGAN PADA SEGMEN PINTU MASUK NILAI HPS : Rp. 3. 610.000.000 7. PEMBANGUNAN PELATARAN PARKIR PADA PINTU MASUK NILAI HPS : Rp. 3. 190.000.000 8. PEMBANGUNAN JALAN LINGKUNGAN PADA SEGMEN RUANG TERBUKA NILAI HPS : Rp. 3. 600.000.000 9. PEMBANGUNAN PELATARAN PARKIR FREE TRADING ZONE NILAI HPS : Rp. 1. 910.000.000 PENANGANAN FISIK KAWASAN PERBATASAN DESA KENEBIBI, KAB. BELU PEMBANGUNAN JALAN LINGKUNGAN NILAI HPS : Rp. 2.500.000.000 PENANGANAN FISIK KAWASAN PERBATASAN DAN PULAU KECIL TERLUAR PEMBANGUNAN JALAN LINGKUNGAN KAB. BELU KEC.KAKULUK MESAK KWS. KABUNA NILAI KONTRAK : Rp. 2.500.000.000 PENANGANAN FISIK KAWASAN PERBATASAN KAWASAN PERDESAAN WELAUS, KEC. MOTAMASIN. KAB.BELU PEMBANGUNAN JALAN LINGKUNGAN NILAI HPS : Rp.2. 500.000.000 PENANGANAN FISIK KAWASAN PERBATASAN KAWASAN PERDESAAN DESA ALAS SELATAN, KEC. MOTAMASIN. KAB.BELU PEMBANGUNAN JALAN LINGKUNGAN NILAI HPS : Rp.2. 500.000.000 PENANGANAN FISIK KAWASAN PERBATASAN KAWASAN DESA KEWAR, KEC. LAMAKNEN PEMBANGUNAN JALAN LINGKUNGAN NILAI HPS : Rp.2. 500.000.000 PENANGANAN FISIK KAWASAN PERBATASAN PINTU MOTAMASIN 1. PEMBANGUNAN JALAN LINGKUNGAN NILAI HPS : Rp. 4.345.600.000 2. PEMBANGUNAN PENGAMAN TEBING DAN PELENGKAPNYA NILAI HPS : Rp. 5.348.000.000 3. PEMBANGUNAN PELATARAN PARKIR NILAI HPS : Rp. 3.690.600.000

  8. Foto- foto PAKET FISIK KAWASAN PERBATASAN KABUPATEN BELU tahun Anggaran-2013 SumurBor 1 Lok. Ds Silawan SumurBor 2 Lok. PBL Mota’ain Rumah Pompa & Genset Sumur Bor 1 Rumah Pompa & Genset Sumur Bor 2 JalurPipa DCIP SilawanZona 2

  9. Foto- foto PAKET FISIK KAWASAN PERBATASAN KABUPATEN BELU tahun Anggaran-2013 Reservoir 50 M3 Lok. PBL Mota’ain Rumah Pompa & Genset Sumur Bor 1 Jaringan Pipa HDPE 90 mm Lok. Silawan Elevated Reservoar Kap. 200 M3