An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Draft MD Planning Tue – Sat (9. – 13.10.)

  2. Draft MD Planning Tue – Fri (9. – 13.10.)

  3. Not (yet) scheduled • emittance preservation studies (8+2) incl. different ADT gains • beta*=40 cm, nominal optics (8+2) • collimation hierarchy limits(8+2) • longitudinal impedance at flat top (4+2) • longitudinal stability for batch (8) • MKI UFOs (8) • Q’ and Q’ vsoct (4+2) • dI/dt tests (8+2) • ADT white noise losses (4+2) • MQY transfer function (4+2) • aperture checks of both sides of the aperture (6+2) • IR8 aperture limits at injection (2) • localization of transverse impedance at injection (2) • TCDQ impedance (2) • collimation impedance (4) • test of TCDI automatic setup software (4) • transverse noise in collisions + coh, b-b modes (8+2) • LR-BB w flat beams (8+2) • ATS (10+2) • Large Piwinski Angle (8) • high pile up with small offset (8+2) • TMCI study (6+2) • emittanceblowup at inj without octupoles from 2011 (6) • p-Pb intensity limits (14+2) • 25 ns e-cloud study (8+2) total: 192++ hours • 144 h could go in MD#4 or floating MD

  4. Operational developments and others • operational developments • EoF studies for beam-beam & instabilities (octupole scans e.g.) • tune measurement from ADT • ADT enhanced frequency response (30’) • few pilot injections for coupling correction software (30’) • longitudinal damper commissioning • batch-by-batch blow up (quite advanced already) • momentum collimators to tighter settings for abort gap (EoF) • others • assume Q’ measurement done in test ramp for recovery after TS • 288-b injection for ring 2 before scrubbing run • UFOs with 25 ns beams parasitic to physics running