AN OVERVIEW IN RESPECT OF CPP’S IN SOUTHERN REGION STATES. STATE-WISE INSTALLED CAPACITY OF CAPTIVE PLANTS (1 MW & ABOVE). MW. STATE-WISE ELECTRICITY GENERATED BY CAPTIVE PLANTS (1 MW & ABOVE). GWh.
E N D
AN OVERVIEW IN RESPECT OF CPP’S IN SOUTHERN REGION STATES
STATE-WISE INSTALLED CAPACITY OF CAPTIVE PLANTS (1 MW & ABOVE) MW
STATE-WISE ELECTRICITY GENERATED BY CAPTIVE PLANTS (1 MW & ABOVE) GWh
STATE-WISE ELECTRICITY GENERATED BY CAPTIVE PLANTS (1 MW & ABOVE) LOAD FACTOR IN %
List of CPPs along with MW quantum applied for STOA and approved
List of CPPs along with MW quantum supplying power to grid in AP
CPP’s IN TAMIL NADU • OPERATIONAL PLANTS WITH CAPACITY OF MORE THAN 10 MW EACH 600 MW • CAPACITY CONNECTED TO TN GRID 180 MW • ENERGY SALE DURING 2004-05 648 MU • AVERAGE RATE Rs.2.90/UNIT • SALE OF ENERGY ENERGY GENERATED BY A CPP IN TAMILNADU • CAN BE USED BY THE OWNER • CAN BE USED BY THE SISTER CONCERN • BALANCE CAN BE SOLD TO TNEB • THIRD PARTY SALE IS NOT PERMITTED
CPP’s IN TAMIL NADUContd… • BANKING • BANKING PERIOD IS 1ST OCTOBER TO NEXT 30TH SEPTEMBER • BANKED ENERGY CAN BE DRAWN DURING BANKING PERIOD IN SUCCEEDING YEAR • BANKING CHARGES TO TNEB WILL BE 2% IN TERMS OF ENERGY • WHEELING • WHEELING CHARGES ARE TO BE 15% IN TERMS OF ENEGY WHEELED IRRESPECTIVE OF VOLTAGE AND DISTANCE
CPP’s IN TAMIL NADUContd… • PRICING OF CAPTIVE POWER THROUGH AGREEMENT • PRICING IS SINGLE PART TARIFF – NORMAL RATE FOR FIRM POWER • PRICING FOR INFIRM POWER TO BE 75% OF NORMAL RATE • NORMAL RATE STARTING FROM THE YEAR 1998-99 TO BE RS.2.25/UNIT WITH ESCALATION AT THE RATE OF 5% EVERY YEAR, TO BE APPLICABLE FOR NEXT 5 YEARS • PRICING OF CAPTIVE POWER THROUGH UI • FLOOR RATE RS.2.10/UNIT (CORRESPONDING TO FREQUENCY 49.8 Hz) • CEILING RATE RS.3.45/UNIT (CORRESPONDING TO FREQUENCY 49.5 Hz) • COMMISSION TO REVISIT THE ISSUE IN 3 YEARS OR AS AND WHEN UI RATES ARE REVISED
CPP’s IN KARNATAKA • APPROX. CAPACITY IN USE 800 MW • 54% ON DIESEL, 21% ON FUEL OIL • CAPACITY UTILISED BY GRID 63 MW • SALE TO GRID • IN CASE OF COMPETITIVE BIDDING ROUTE/CEILING PRICE RS.2.87/UNIT • IN CASE OF NON COMPETITIVE BIDDING PRICES ARE TO BE ADOPTED BASED ON UI RATES • BANKING • NO BANKING FACILITY IS AVAILABLE • METERING • 15 MINUTES BLOCK METERS TO BE INSTALLED BY THE CONCERNED LICENCEES
CPP’s IN ANDHRA PRADESH • CAPACITY UTILISED BY GRID AROUND 100 MW • SALE TO GRID • RATES TO BE DECIDED ON THE BASIS OF LONG TERM AGREEMENTS • BANKING • NO BANKING FACILITY IS AVAILABLE OTHER THAN WIND/MINI HYDEL • METERING • 15 MINUTES BLOCK METERS TO BE INSTALLED BY THE CONCERNED LICENCEES
CPP’s IN KERALA • SALE TO GRID • PLANT SHALL ENSURE TO DISPATCH ELECTRICITY AS PER SCHEDULE • UI SHALL NOT EXCEED 10% OF TOTAL DISPATCH IN A DAY • UI SHALL NOT EXCEED 5% OF TOTAL DISPATCH DURING PEAK • OPEN ACCESS • PLANT CAN SEEK OPEN ACCESS AND SHALL BE ALLOWED NON-DISCRIMENATORY ACCESS SUBJECT TO AVAILABILITY OF CORRIDOR
CPP’s IN KERALAContd… • TRANSMISSION AND WHEELING CHARGES FOR NCE PLANTS • TRANSMISSION CHARGES – 3% OF WHEELED ENERGY • WHEELING CHARGES – 5% OF WHEELED • OTHER PLANTS TO PAY THESE CHARGES AS DETERMINED BY COMMISSION UNDER OPEN ACCESS ACT • CPP WILL NOT BE LIABLE TO PAY SURCHARGE IN ADDITION TO CHARGES FOR TRANSMISSION AND WHEELING IN CASE OF HIS OWN USE • SUBJECT TO TECHNICAL FEASIBILITY THE CPP MAY BE REQUIRED TO EXTEND POWER TO UTILITY’S SYSTEM IN THE EVENT OF EMERGENCY SITUATION.
STATE-WISE INSTALLED CAPACITY OF CAPTIVE PLANTS (1 MW & ABOVE)