An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The independent campaign for a better bigger railway

  2. on-time trains getting a seat value for money frequent services quicker journeys simple fares clear accurate information helpful customer service safe clean trains/stations easy bus connections empty car/cycle spaces industry teamwork more freight by rail new stations and lines Railfuture campaigns for:

  3. Learning points • Network Rail Long Term Planning Process • Message for campaigners • collaborate with strategic stakeholders to identify the economic and environmental needs • define the matching benefits to be secured through transport improvements • do not obsess over proposing 'solutions'. • Success through incremental development • Airdrie – Bathgate • Electrified double track main line • Started as single track diesel Bathgate – Edinburgh service • Chiltern Evergreen

  4. The exam question • DfT statement 9th May: • NR to review Lewes–Uckfield reopening • Can reopening Uckfield - Lewes add network capacity and drive economic growth?

  5. Bridge the Gap – Connect East Sussex • Travelling across East Sussex isn’t easy • congested roads between Weald and South Coast towns • Uckfield train to London 25 min longer than Wivelsfield • only two through trains to London from Newhaven • London trains from Eastbourne and Brighton overcrowded • Extend trains from Uckfield to Lewes and Brighton • direct services from Weald to Brighton for jobs • faster more reliable trains from Uckfield to London • direct London to Newhaven trains, helping regeneration • alternative route to London, relieving Brighton Main Line

  6. Bridge the Gap campaign plan • Railfuture is working with consultants JRC to: • Collect evidence of economic and transport needs in Sussex • where do people live, work and meet? • where are the transport gaps? • engage key stakeholders • build public and stakeholder recognition • Create vision of regional economic growth • enabled by better travel links between communities and principal economic centres. • Mobilise active support of stakeholders to: • agree an achievable scope • identify solution options • propose solution which stakeholders can fund

  7. Sussex transport needs - 1 • Economic factors • Brighton is key employment centre • Decline in rural employment • Deprived communities in Newhaven and Hastings • New homes planned • High level of commuting • Fuel prices increasing but incomes static • Limitations • Rail services at capacity • A27 is only dual carriageway across East Sussex • Bus is only public transport from Weald to South Coast • Hastings isolated by long travel times

  8. Sussex transport needs - 2 • Additional capacity and journey options • Improved journey experience • Direct link from Weald to Lewes and Brighton • Additional South Coast to London capacity • New traffic flows, eg Newhaven to London • Closer, more reliable connections • Quicker Hastings to Brighton journeys

  9. Rail capacity constraints • Brighton Line • London terminals • East Croydon junctions • Keymer junction • Balance of Brighton and West Coastway trains • Uckfield Line • Capacity at East Croydon • Hurst Green to East Croydon double track • Hever to Uckfield single track sections • Brighton-facing route no longer available at Lewes • Longer route to Brighton – times uncompetitive • Diesel powered

  10. The exam answer • Evidence-based approach to identify needs • Benefits secured through transport improvements • Regional economic growth -> positive business case • Partnership to energise and inspire stakeholders • Incremental development proposal • affordable • meets identified needs • opened in a foreseeable timescale • delivers benefits agreed with stakeholders • aligns with NR plans • commands support of political and industry stakeholders

  11. Reopen Uckfield–Lewes - phasing illustration • CP5 (2014-19) • Accelerate and lengthen existing services • Increase off-peak frequency • CP6 (2019-24) • New track from Uckfield to Lewes • Connection allowing direct stopping trains to Brighton • Limited stop trains to Newhaven or Eastbourne • Optional electrification • Optional connection to Tunbridge Wells West • When East Croydon constraints resolved • Redouble Hever to Lewes • Electrification • More trains • Cross-London link

  12. Uckfield – Lewes rail reinstatement