60 likes | 207 Views
SVW Requirements. Capt Caroline Bower Joint Typhoon Warning Center. Operational Requirements. Better spatial coverage Decrease data gaps Wider swath width Multiple sensors Improved spatial resolution For improved TC positioning potential
E N D
SVW Requirements Capt Caroline Bower Joint Typhoon Warning Center
Operational Requirements • Better spatial coverage • Decrease data gaps • Wider swath width • Multiple sensors • Improved spatial resolution • For improved TC positioning potential • For improved TC structural analysis (yields better model input, and better forecasts) • For improved wind distribution analysis
Operational Requirements • Improved data integrity • Rain flag discrimination • Multiple algorithms available – which one is right? • Performance in critical and high-interest areas (TC core)
Operational Requirements • Transitional displays • Streamline transition from current displays to future displays
Operational Requirements • Documentation • Knowledge needed for correct application • Intended or recommended use • Known strengths and weaknesses • User tutorials • COMET modules
Questions? Capt Caroline Bower JTWC 808 474-3946 e-mail: caroline.bower@navy.mil