Work Package 3 Harmonisation of basic data

Work Package 3 Harmonisation of basic data. Vukovar , 13 th of December, 2012. AGENDA. Info WPL; OBJECTIVE of WP 3; ACTIVITIES; EXPECTED RESULTS. Work Package Leader. Claudiu DUTU , AFDJ Galati – ROMANIA; WPL for next 2 years;. OBJECTIVE for WP3.

bunme
Download Presentation

Work Package 3 Harmonisation of basic data

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Work Package 3 Harmonisation of basic data Vukovar, 13th of December, 2012

  2. AGENDA • Info WPL; • OBJECTIVE of WP 3; • ACTIVITIES; • EXPECTED RESULTS

  3. Work Package Leader • Claudiu DUTU, • AFDJ Galati – ROMANIA; • WPL for next 2 years;

  4. OBJECTIVE for WP3 • to find a common approach to harmonise the basic data; • Hydrology; • Hydrography; • Waterway maintenance.

  5. Activities within WP3 • Act. 3.1 Common approach regarding water level information & forecasts; • Act. 3.2 Harmonisation of shallow section information; • Act. 3.3 Pilot for marking plans

  6. ACT. 3.1 Common approach regarding water level information & forecasts • Report on common Quality of service for water level information; • Report about harmonisation of water level forecast; • Concept for water gauge monitoring; • Concept to improve the national water level information

  7. Results Act 3.1 • HU – server for WLI, workstation WLI, network management and UPS WLI; • RO • Danube, automatic tide gauges (2 pieces), soft WLI; • Danube Black Sea Canal – automatic tide gauge stations (2 pieces), soft WLI; • RS – automatic tide gauges stations (2 pieces)

  8. Act. 3.2 Harmonisation of shallow section information • Status quo report on shallow section information; • Concept for common quality of service for displaying shallow section information;

  9. Results Act. 3.2 • Agreement about Content and format • River bank lines; • Limits of the fairway; • Signalization… • Minimum depths • Date of the survey • background • Information on FIS Portal….

  10. Act. 3.3 Pilot for marking plans • Status quo report on current procedures for marking plans; • Concept including technical specification and system architecture for common marking plan database;

  11. Results Act. 3.3 • RO – ship / shore application MP; • BG – ship / shore application MP; • HR – ship / shore application MP; • RS – server MP + centralized application;

  12. Concept – Master Database

  13. PP - Component

  14. Structure • ship software application • introducing / updating field common elements; • shore software application • collecting / introducing updates liked with centralized server; • Centralized server • synchronizing all common stretch and presenting (web presentation) the signalization status; • Automatic emailing to the skippers / linked to FIS Portal…etc.

  15. CLAUDIU DUTU – AFDJ GALATI ROMANIA claudiu.dutu@afdj.ro