Work Package 3 Harmonisation of basic data Vukovar, 13th of December, 2012
AGENDA • Info WPL; • OBJECTIVE of WP 3; • ACTIVITIES; • EXPECTED RESULTS
Work Package Leader • Claudiu DUTU, • AFDJ Galati – ROMANIA; • WPL for next 2 years;
OBJECTIVE for WP3 • to find a common approach to harmonise the basic data; • Hydrology; • Hydrography; • Waterway maintenance.
Activities within WP3 • Act. 3.1 Common approach regarding water level information & forecasts; • Act. 3.2 Harmonisation of shallow section information; • Act. 3.3 Pilot for marking plans
ACT. 3.1 Common approach regarding water level information & forecasts • Report on common Quality of service for water level information; • Report about harmonisation of water level forecast; • Concept for water gauge monitoring; • Concept to improve the national water level information
Results Act 3.1 • HU – server for WLI, workstation WLI, network management and UPS WLI; • RO • Danube, automatic tide gauges (2 pieces), soft WLI; • Danube Black Sea Canal – automatic tide gauge stations (2 pieces), soft WLI; • RS – automatic tide gauges stations (2 pieces)
Act. 3.2 Harmonisation of shallow section information • Status quo report on shallow section information; • Concept for common quality of service for displaying shallow section information;
Results Act. 3.2 • Agreement about Content and format • River bank lines; • Limits of the fairway; • Signalization… • Minimum depths • Date of the survey • background • Information on FIS Portal….
Act. 3.3 Pilot for marking plans • Status quo report on current procedures for marking plans; • Concept including technical specification and system architecture for common marking plan database;
Results Act. 3.3 • RO – ship / shore application MP; • BG – ship / shore application MP; • HR – ship / shore application MP; • RS – server MP + centralized application;
Structure • ship software application • introducing / updating field common elements; • shore software application • collecting / introducing updates liked with centralized server; • Centralized server • synchronizing all common stretch and presenting (web presentation) the signalization status; • Automatic emailing to the skippers / linked to FIS Portal…etc.
CLAUDIU DUTU – AFDJ GALATI ROMANIA claudiu.dutu@afdj.ro