An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Autonomous Distributed V2G (Vehicle-to-Grid) Satisfying Scheduled Charging Authors: H. Taniguchi, T. Nakajima, K.M. Liyanage, J. Baba Presenter: Jian Qiao

  2. Outline • Introduction • V2G Control Scheme • Power Grid Model • V2G Model • Battery Model • Simulation Results • Conclusion

  3. Introduction 1. Smart grid strategies are expected to utilize distributed generations and controllable loads in the demand side. 2. Integration of EV and PHV brings potential of V2G. 3. Supply and demand dispatch reduces the cost. 4. Propose autonomous distributed V2G control scheme providing spinning reserve for intermittency of RESs.

  4. V2G Control Scheme (1) 1.Supply and demand imbalance can be observed from frequency deviation; 2. V2G power is controlled with droop characteristics against the frequency deviation. Traditional Charging

  5. V2G Control Scheme (2) Smart Charging

  6. Power Grid Model • 50 Hz system • two interconnected power grid One V2G pool includes 20 000 vehicles Two V2G pools in grid A , one with large size battery (EV1) and the other with middle size battery (EV2); Grid B has one V2G pool including PHVs with small size battery. 6

  7. Battery Model • Simplified battery model: voltage source including open circuit voltage (OCV) and internal resistance (Rint) • Necessary energy from the present SOC (SOCi) to the destination SOC (SOCd) is calculated by integrating the OCV as follows:

  8. Battery Model • Closed Circuit Voltage and V2G power • SOC is updated as

  9. Simulation Results (1) EV1 is plugged in grid A at 2h with initial SOC as 20%, then scheduled to be plugged out with destination SOC as 90% after 8hours. EV2 and PHV work as V2G pool maintaining 50% SOC during the simulation. Frequency deviation for grid A and grid B.

  10. Simulation Results (2) V2G power output of EV1, EV2 and PHV

  11. Simulation Results (3) Battery SOC of EV1, EV2 and PHV

  12. Conclusions • Effective for distributed spinning reserve without system wide information exchange; • Proposed smart charging control scheme satisfies the schedule charging by the vehicle users.