Team 8 : Batteries Not Included

Team 8 : Batteries Not Included. Dave Dickinsheets Matt Scholten David Qu Knoa Knapper. Presentation Outline. Project Re-introduction Design Process Major Obstacles Major Accomplishments Next Steps. Project Re-Introduction. Battery-free Tire Pressure Monitoring System. Design Process.

buzz
Download Presentation

Team 8 : Batteries Not Included

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Team 8 : Batteries Not Included Dave Dickinsheets Matt Scholten David Qu Knoa Knapper

  2. Presentation Outline • Project Re-introduction • Design Process • Major Obstacles • Major Accomplishments • Next Steps

  3. Project Re-Introduction Battery-free Tire Pressure Monitoring System

  4. Design Process • Utilized feasibility calculations/physics resources • Number of wraps on coil • Coil diameter • Magnet Orientation • Tested theories on test apparatus • Adjusted design accordingly

  5. Major Obstacles • Magnet Orientation • Proper orientation gives higher voltage • Proper orientation reduces the number of magnets necessary • Coil Design/Manufacturing • Compact coils • Working coils • Mounting

  6. Major Accomplishments • Working test apparatus

  7. Major Accomplishments • Magnet Mounting Bracket Design Magnet Threaded Height Adjustment Caliper Caliper Mounting Holes

  8. 3 Volts at ~25 mph 4.5 Volts at ~42 mph 6 Volts at ~60 mph 7.5 Volts at ~75 mph All voltages are half wave heights All speeds are simulated on test apparatus without a tire mounted Major Accomplishments • Voltage Generation Readings taken at 5 V/division on Y-axis 5 ms/division on X-axis

  9. Major Accomplishments • Circuit Design Tested • Half Wave Rectifier • Requires Voltage Regulator • Magnet Orientation • Coil Design Improved • Purchased TPMS System • Budget Under Control

  10. Next Steps • Refine magnet and coil size • Refine circuit design • Mounting design for coil and circuit • Magnet bracket construction • Develop TPMS testing method

  11. Questions?