Construction Activities: P-209 Depth checks on Runway completed

Engineering & Construction Management Department. August Report, 2011. EPIA Runway 8R-26L & Taxiway L Extension & Reconstruction of Taxiway W.

cachez
Download Presentation

Construction Activities: P-209 Depth checks on Runway completed

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Engineering & Construction Management Department AugustReport, 2011 EPIA Runway 8R-26L & Taxiway L Extension & Reconstruction of Taxiway W • General Project Description: The project will consist of the extension of Runway 8R-26L 1,100 feet to the east as well as the extension of Taxiway L to the east by approximately 1,100 feet, new runway and taxiway lighting for the extensions and a new hold pad for Runway 26L. Construction Activities: • P-209 Depth checks on Runway completed • P-403 Asphalt placed on Taxiway L, W and holding area • P-501 Concrete placement scheduled to start August 10, 2011 Project Schedule Page 1 of 2

  2. Engineering & Construction Management Department AugustReport, 2011 EPIA Runway 8R-26L & Taxiway L Extension & Reconstruction of Taxiway W • General Project Description: The project will consist of the extension of Runway 8R-26L 1,100 feet to the east as well as the extension of Taxiway L to the east by approximately 1,100 feet, new runway and taxiway lighting for the extensions and a new hold pad for Runway 26L. Project Budget: (includes approved project development, design and construction costs) $7,563,087.00 Notes Funding Source: FAA Grant and PFC Project Contact Project Manager Victoria Ruiz 915-541-4357 Design Consultant Kimley-Horn Construction Contractor J.A.R. Construction Page 2 of 2