1 / 5

Philip Diamond Radio Net Coordinator University of Manchester Jodrell Bank Observatory

h. Philip Diamond Radio Net Coordinator University of Manchester Jodrell Bank Observatory. Implementation Plan for next 18 months MTR: 12 April 2007 Grenoble. 18 month plan. Plan covers the period 1 Jan 2007 – 30 June 2008, i.e. leaves only 6 months of RadioNet remaining

cade-moon
Download Presentation

Philip Diamond Radio Net Coordinator University of Manchester Jodrell Bank Observatory

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. h Philip Diamond RadioNetCoordinator University of Manchester Jodrell Bank Observatory Implementation Plan for next 18 months MTR: 12 April 2007 Grenoble

  2. 18 month plan • Plan covers the period 1 Jan 2007 – 30 June 2008, i.e. leaves only 6 months of RadioNet remaining • As always, 18 month plan is an ‘amendment to the contract’, it defines the planned scope of work - see Annexe D of AR3 for details. • Althea will deal with financial issues. Critical because we are now looking at the ‘end game’ • A major effort over next 9 months will focus on the planning for the FP7 RadioNet proposal

  3. Networking • N1: Management – same focus and level of effort as previously • N2: Synergy – technical exchanges (Latvian VIRAC staff to Torun & Noto; OAN staff to ASTRON). Implement new RadioNet portal, discuss possible developments of NorthStar • N3: Science Workshops – major programme: LOFAR science (in 2 weeks); 2nd ERIS (Bonn, Sept); Massive star formation (Heidelberg, Sept); YERAC (Bordeaux, Autumn); Modern Radio Universe (Manchester, Oct); CSS/GPS (Riccione, Spring 08); 9th EVN Symp (Bologna); 6th IRAM Interf. School; Central kpc of AGN (Mykonos). • N4: Workshops on digital receivers, digital backends, antennas + EVN-TOG • N6: ALMA Community Day (Garching); ALMA and surveys (Italy); ALMA software demo and tutorial; mm calibration techniques • N7: JBO 7-m telescope more accessible for internet users; SKA ISSC meetings; discussions of future of radio astronomy with ESO/ESO Council • N8: busy programme of ITU, CRAF and CEPT meetings

  4. JRAs • ALBUS: • Provide software and final report on calibration transfer – March 2007 • Report on ionospheric calibration options – June 2007 • Implementation of tropospheric calibration software – October 2007 • Post-correlator target selection – October 2008 (stretch target) • Implementation of wideband imaging – July 2008 • Evaluation of wide-field imaging algorithm – November 2008 • ParselTongue – January 2008 • ALBUS complete Oct 08, no extra funding • AMSTAR • Wide IF-band mixer (80-116 GHz) – stretch goal 8% - December 2007 • Wide IF-band mixer (385-500 GHz) – December 2007 • Wide IF-band mixer (600-720/800-950 GHz) – June 2007 • 2SB SIS Mixer (350 GHz) – work delayed, complete July 2007 • 2SB SIS Mixer (600-720 GHz) – September 2007 • HEB on Si3N4/SiO2 membranes – March 2007 • Balanced 1.3 GHz HEB mixer – December 2007 • Focal Plane Heterodyne Array Receiver – June 2007 • AMSTAR complete Dec 07, some extra funding requested

  5. JRAs • PHAROS • Full functional test of PHAROS cryostat – May 2007 • Assemble beamformer – October 2007 • Control software complete – September 2007 • Tests in ASTRON measurement chamber – Jan 2008 • Tests on Lovell and maybe Parkes – July 2008 • Test advanced technology MMICs – June 2007 • PHAROS complete Jul 2008, no extra funds TNAs • TNAs continue at current rate, push for more publications.