Acceleratingthe project Edina NagyLajos KissSzabolcs Hornyák
Overview • Introduction • Project accelerationterminology • Normal Time, normalcost • Crash Time, crashcost • DirectCosts • IndirectCosts • Total Project Cost • Optimum Project Duration • Project accelerationprinciples • References
Introduction „When I knowallinformation, only canmake aright decisions.” Paulo Coelho
Introduction • Steps of right decision: • Definiate: Time and costs • Analysedthepossibilities • Comparetheopportunities • Choosethebestway
Project accelerationterminology Normal Time, normalcost Thisis theusualtimethatwould be neededtocarry out theelectricalservicesworkundernormalcircumstances, estimatedat 12 dayswith a cost of £10.000.
Project accelerationterminology Crash Time, crash cost The crash time is the maximum time the operation can be compressed by increasing the resources. Crash time: 8 days Crash cost: £18.000
Project accelerationterminology CostSlope
Project accelerationterminology Activityranking • Analysedtheprecedencerelationship • Identifiedthecriticalactivities • Rankingbythecost • Reducetheduration • Definethecriticalpath
Project accelerationterminology Directcosts: • Labour • Plants • Materials • Subcontractors • Overheads and profit
Project accelerationterminology Indirectcosts: • Project supervision • Site hutting and accomodation • Site officetelephones,heating and lighting • Vans and site transport
Project accelerationterminology Directcosts + Indirectcosts Total cost
Project accelerationprinciples Example – basedon a networkarrow diagram
Project accelerationprinciples Project datas
Project accelerationprinciples Normaltime / NormalCostanalysis
Project accelerationprinciples Normaltime / NormalCostanalysis
Project accelerationprinciples Revisedarrow diagram
Project accelerationprinciples Reduction in project period
References - pp. 186-196Paragraph 9.9Acceleratingthe project