ECS status and PLANS

ECS status and PLANS. Xavier Vilasis-Cardona. Outline. Schedule is tight and there is a lot of work to do Achievements Current issues Plans. Schedule is tight. There is a lot of work to do Aim at a working detector ECS to be ready to check there are no HW errors Refine later

cade
Download Presentation

ECS status and PLANS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ECS status and PLANS Xavier Vilasis-Cardona Calo Commissioning Meeting - Xvc

  2. Outline • Schedule is tight and there is a lot of work to do • Achievements • Current issues • Plans Calo Commissioning Meeting - Xvc

  3. Schedule is tight • There is a lot of work to do • Aim at a working detector • ECS to be ready to check there are no HW errors • Refine later • Commissioning weeks as milestones • 4 - 8 February • 3 - 7 March • 31 March - 4 April • 5 - 9 May Calo Commissioning Meeting - Xvc

  4. Achievements • C-Side • HCAL DAQ – HV installed and working • ECAL DAQ – HV installed and working with some issues (see next transparency) • PRS installed • A-Side • HV projects are installed • LEDTSB boards are installed • DCS • Rack Control Project • Calo Power Supply projects • Temperature Monitoring of VFE (PS) Calo Commissioning Meeting - Xvc

  5. Issues • CROC configuration and reset • LEDTSB – CROC • PRS-SPD • PRS project • Massive configuration problems • LED system status ? • TELL1 component problems • Should be fixed • Power Supplies • Check Alarm Action matrix • Delay times and MVPS disconnection Calo Commissioning Meeting - Xvc

  6. Other • Integration of VFE temperature Monitoring • In the FSM • PS and SPD • Collect temperature readings in RACKs • Cooling plant ECS • New Framework components soon available Calo Commissioning Meeting - Xvc

  7. Main Goals Calo Commissioning Meeting - Xvc

  8. Moving to Linux • Efficiency reasons • Test PC available cadaqhv01 • Test main elements • Priority is on a working detector • Only SPECS DAQ PCs • Software Compatibility • PVSS should be OK • CAT base should be OK but needs to be checked • CAT developments • Other ? • Groups check their software on the test PC Calo Commissioning Meeting - Xvc

  9. 4FEB – Goals and Tasks I Calo Commissioning Meeting - Xvc

  10. 4FEB – Goals and Tasks II - PRS Calo Commissioning Meeting - Xvc

  11. Move to Linux • Lower Priority Calo Commissioning Meeting - Xvc

  12. 03MAR plans • Finish any pending on the C-side • Install missing DAQ parts • Install CAT server on PVSS • If possible – evaluate the migration to linux • Test and integrate Calo Commissioning Meeting - Xvc