Consortium Meeting, June 99, BU Recent Progress. a Summary of Progress during the last six months Matthew Whyndham. Recent Progress. Dec 98 US Partner Selection Jan 99 Consortium Meeting (NRL) Mar 99 Solar-B mission kick-off meeting (ISAS) choice of EIS configuration

cadee
Download Presentation

Consortium Meeting, June 99, BU Recent Progress

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Consortium Meeting, June 99, BU Recent Progress a Summary of Progress during the last six months Matthew Whyndham

  2. Recent Progress • Dec 98 US Partner Selection • Jan 99 Consortium Meeting (NRL) • Mar 99 Solar-B mission kick-off meeting (ISAS) • choice of EIS configuration • choice of wavelength ranges • Apr, May 99 optical design evolution • May 99 Engineering Meeting (NRL) Consortium Meeting 9906 - Summary of Progress - MWT

  3. US Partner Selection • All three Solar-B scientific payloads have US contributions • All instruments have Japanese PI’s • SOT - S. Tsuneta • FPIP : Alan Title - LMATC • XRT - K. Shibasaki • Leon Golub - SAO • EIS - T. Watanabe • Len Culhane - MSSL/UCL, BU, RAL + science team • George Doschek - NRL, GSFC Consortium Meeting 9906 - Summary of Progress - MWT

  4. Mission Kick-Off Meeting • Introduction of Solar-B main players :ISAS, NAO, MELCO, instrument groups • Concept of J-side PI/secretariat team • Mission philosophy, Master Schedule • Spacecraft Engineering Overview • Instrument Team design sessions • EIS Actions  on the web Consortium Meeting 9906 - Summary of Progress - MWT

  5. Choice of configuration • Strawman/baseline - • off-axis paraboloid • 1 reflection + grating • high throughput • excellent spectral resolution • NRL proposal • Cassegrain • 2 reflections + grating • high spatial resolution NB: a 1.5 m RC radius was actually proposed Consortium Meeting 9906 - Summary of Progress - MWT

  6. Choice of configuration (2) • Cassegrain or OAP? • Technical drivers • feasibility, costphysical resourcesdisturbance torque • Structure, Optics, Detectors, Electronics • Line lists + Effective areas = useful lines in QS, AR, Flare • Consider relative value • Spatial Resolution • Count-rate/throughput • Decision-making panel ISAS, NAOJ, NASA, NRL, PPARC/MSSL • Throughput (OAP) given priority Consortium Meeting 9906 - Summary of Progress - MWT

  7. Choice of wavelength ranges • A large number of wavebands were thoroughly studied • wavelength reports on website (Solar-B EIS > documents > Science > Science Notes) • “EIS 400” - Transition region • use of novel Si/Sc multilayer • rejected at January meeting on grounds of technical immaturity of multilayer • Left with Baseline, NRL1, NRL2 • At March meeting, decided to go with Baseline+NRL1 • Short wavelength band: 170-210 Å • Long wavelength band: 250-290 Å • Bands are tuned to accept laboratory calibration lines • Consistent with ML bandpass • strong preference not to overlap in same space : prefer to have stacked spectra (á la SOHO-CDS)  on the web Consortium Meeting 9906 - Summary of Progress - MWT

  8. Optical design evolution • NRL/GSFC - produce OAP design • prioritize spectral resolution • improve spatial resolution where possible • NRL/MSSL series of teleconferences some Minutes online • discuss progress and direction of optical design • need for engineer-level round-table interaction • NRL Opto-mechanical engineering meeting • Preferred design EIS-7T • details circulated by FTP 7 May 99 ftp://tcrb.nrl.navy.mil/pub/eis/EIS7T • one of a series of optimisations • small toroidal grating - low risk & more vendor choice • grating magnification - short spectrometer section - add telescope length improve spatial resolution  on the web Consortium Meeting 9906 - Summary of Progress - MWT

  9. Outputs NRL/GSFC - reduce lengthby 10 cm - issue new optical layout EIS7Tr “reduced”ftp://tcrb.nrl.navy.mil/pub/eis/EIS7TR/ BU/MSSL - iterate structural concept, use sectional construction- include radiator placement - camera update other actions A.66-A.90see EIS-meet-cons-9905mins Meeting Objectives US, UK, J involvement review NRL/GSFC work to date approve the criteria and results (e.g. resolution) review subsystem technology & designsitems connected with main instrument suggest ideal placement iterate before BU consortium meeting Opto-mechanical engineering meeting  on the web Consortium Meeting 9906 - Summary of Progress - MWT